Realtime National Passenger Train Stats

Saturday, 14 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 23:55:57

On Time

15554

77.5%

Late

4515

22.5%

Cancelled / Very Late

1132

5.6%

Total

20069

 

National PPM

77%

Rolling: 73%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

97.3%

Late

2.7%

Cancelled / Very Late

0.8%

Total Trains

973

PPM: 97%

Worst Performing Operator

Avanti West Coast

On Time

39.2%

Late

60.8%

Cancelled / Very Late

15.6%

Total Trains

288

PPM: 39%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 113 175 45 288 39% 57%
c2c 221 52 11 273 80% 80%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 179 40 14 219 81% 92%
CrossCountry 164 97 53 261 62% 60%
East Midlands Railway 348 195 45 543 64% 63%
Elizabeth line 947 26 8 973 97% 96%
Grand Central 11 9 3 20 55% 50%
Great Western Railway 1138 387 84 1525 74% 73%
Greater Anglia 1054 75 3 1129 93% 90%
Greater Thameslink Railway 2190 644 81 2834 77% 74%
Heathrow Express 140 10 0 150 93% 100%
Hull Trains 10 2 1 12 83% —
London North Eastern Railway 140 49 14 189 74% 73%
London Overground 1275 197 83 1472 86% 96%
Lumo East Coast 8 4 0 12 66% 50%
Lumo West Coast 9 1 0 10 90% 100%
Merseyrail 566 34 14 600 94% 89%
Northern Trains 1712 850 234 2562 66% 56%
ScotRail 1815 337 66 2152 84% 66%
South Western Railway 1143 276 47 1419 80% 83%
Southeastern 750 304 39 1054 71% 61%
TransPennine Trains 279 72 25 351 79% 73%
Transport for Wales 726 320 111 1046 69% 59%
West Midlands Trains 792 385 155 1177 67% 72%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 10 2 1 12 83% —
DB Cargo 76 17 0 93 81% 100%
Direct Rail Services 8 6 0 14 57% —
Freightliner Intermodal 30 3 0 33 90% —
GB Railfreight 55 19 2 74 74% 87%
Heavy Haul Rail 16 4 0 20 80% —
Network Rail - Materials 35 5 0 40 87% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo