On Time

10111

85.3%

Late

1744

14.7%

Cancelled / Very Late

506

4.3%

Total

11855

 

National PPM

85%

Rolling: 84%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

96.8%

Late

3.2%

Cancelled / Very Late

2.3%

Total Trains

347

PPM: 96%

Worst Performing Operator

Grand Central

On Time

20.0%

Late

80.0%

Cancelled / Very Late

20.0%

Total Trains

10

PPM: 20%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 120 43 13 163 73% 61%
c2c 115 29 4 144 79% 66%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 169 8 0 177 95% 93%
CrossCountry 100 38 19 138 72% 66%
East Midlands Railway 213 36 1 249 85% 92%
Elizabeth line 477 88 43 565 84% 90%
Grand Central 2 8 2 10 20% 0%
Great Western Railway 807 100 8 907 88% 86%
Greater Anglia 647 40 3 687 94% 97%
Greater Thameslink Railway 1485 324 73 1809 82% 82%
Heathrow Express 62 22 2 84 73% 43%
Hull Trains 7 0 0 7 100% —
London North Eastern Railway 64 33 17 97 65% 13%
London Overground 718 79 53 797 90% 98%
Lumo East Coast 4 1 0 5 80% 100%
Lumo West Coast 4 0 0 4 100% 100%
Merseyrail 336 11 8 347 96% 94%
Northern Trains 1149 284 71 1433 80% 74%
ScotRail 1068 124 31 1192 89% 85%
South Western Railway 658 190 60 848 77% 79%
Southeastern 786 146 48 932 84% 86%
TransPennine Trains 134 17 7 151 88% 75%
Transport for Wales 478 80 31 558 85% 87%
West Midlands Trains 585 74 16 659 88% 91%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 13 2 2 15 86% 83%
DB Cargo 52 2 0 54 96% 84%
Direct Rail Services 4 3 0 7 57% 33%
Freightliner Intermodal 6 0 0 6 100% —
GB Railfreight 37 8 2 45 82% 85%
Heavy Haul Rail 24 9 0 33 72% 55%
Network Rail - Materials 45 9 0 54 83% 88%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.