On Time

16912

82.5%

Late

3582

17.5%

Cancelled / Very Late

861

4.2%

Total

20494

 

National PPM

82%

Rolling: 80%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

97.2%

Late

2.8%

Cancelled / Very Late

1.8%

Total Trains

567

PPM: 97%

Worst Performing Operator

Grand Central

On Time

50.0%

Late

50.0%

Cancelled / Very Late

11.1%

Total Trains

18

PPM: 50%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 192 94 30 286 67% 53%
c2c 232 98 6 330 70% 70%
Caledonian Sleeper Limited 3 0 0 3 100% —
Chiltern 283 37 4 320 88% 93%
CrossCountry 148 94 37 242 61% 45%
East Midlands Railway 313 130 32 443 70% 65%
Elizabeth line 923 41 3 964 95% 99%
Grand Central 9 9 2 18 50% —
Great Western Railway 1331 209 62 1540 86% 87%
Greater Anglia 1106 73 6 1179 93% 94%
Greater Thameslink Railway 2278 765 203 3043 74% 70%
Heathrow Express 133 5 0 138 96% 100%
Hull Trains 7 6 3 13 53% 0%
London North Eastern Railway 122 51 19 173 70% 33%
London Overground 1365 79 39 1444 94% 89%
Lumo East Coast 7 3 2 10 70% 100%
Lumo West Coast 6 2 0 8 75% 100%
Merseyrail 551 16 10 567 97% 93%
Northern Trains 1990 510 100 2500 79% 77%
ScotRail 1712 273 40 1985 86% 88%
South Western Railway 1215 278 75 1493 81% 88%
Southeastern 1182 438 93 1620 72% 70%
TransPennine Trains 228 49 13 277 82% 59%
Transport for Wales 862 99 40 961 89% 85%
West Midlands Trains 876 248 49 1124 77% 80%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 24 1 0 25 96% —
DB Cargo 89 8 0 97 91% 88%
Direct Rail Services 21 5 0 26 80% 60%
Freightliner Intermodal 41 8 0 49 83% 80%
GB Railfreight 75 24 0 99 75% 76%
Heavy Haul Rail 57 10 0 67 85% 100%
Network Rail - Materials 96 20 0 116 82% 85%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo