Realtime National Passenger Train Stats

Monday, 2 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 09:02:56

On Time

3034

82.0%

Late

665

18.0%

Cancelled / Very Late

174

4.7%

Total

3699

 

National PPM

82%

Rolling: 80%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

30

PPM: 100%

Worst Performing Operator

London North Eastern Railway

On Time

37.5%

Late

62.5%

Cancelled / Very Late

18.8%

Total Trains

16

PPM: 37%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 24 3 2 27 88% 87%
c2c 37 23 5 60 61% 60%
Caledonian Sleeper Limited 1 1 0 2 50% 50%
Chiltern 54 4 0 58 93% 90%
CrossCountry 23 10 6 33 69% 67%
East Midlands Railway 62 8 3 70 88% 88%
Elizabeth line 188 8 0 196 95% 94%
Grand Central 0 0 0 0 — —
Great Western Railway 244 25 1 269 90% 87%
Greater Anglia 222 10 1 232 95% 97%
Greater Thameslink Railway 465 159 60 624 74% 70%
Heathrow Express 30 0 0 30 100% 100%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 6 10 3 16 37% 35%
London Overground 245 7 4 252 97% 97%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 93 1 0 94 98% 100%
Northern Trains 326 118 26 444 73% 74%
ScotRail 257 67 17 324 79% 78%
South Western Railway 204 53 11 257 79% 76%
Southeastern 266 66 8 332 80% 75%
TransPennine Trains 33 15 4 48 68% 69%
Transport for Wales 149 21 9 170 87% 85%
West Midlands Trains 135 56 14 191 70% 71%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 8 0 0 8 100% 100%
DB Cargo 23 3 0 26 88% 87%
Direct Rail Services 1 0 0 1 — —
Freightliner Intermodal 2 0 0 2 100% —
GB Railfreight 16 4 0 20 80% 100%
Heavy Haul Rail 8 1 0 9 88% 66%
Network Rail - Materials 28 1 0 29 96% 80%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo