Realtime National Passenger Train Stats

Friday, 27 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 02:08:56

On Time

80

78.4%

Late

22

21.6%

Cancelled / Very Late

9

8.8%

Total

102

 

National PPM

78%

Rolling: —

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Greater Thameslink Railway

On Time

84.0%

Late

16.0%

Cancelled / Very Late

8.0%

Total Trains

25

PPM: 84%

Worst Performing Operator

Great Western Railway

On Time

57.1%

Late

42.9%

Cancelled / Very Late

14.3%

Total Trains

14

PPM: 57%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0 — —
c2c 1 3 3 4 25% —
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 4 0 0 4 100% —
CrossCountry 0 0 0 0 — —
East Midlands Railway 0 0 0 0 — —
Elizabeth line 4 0 0 4 100% —
Grand Central 0 0 0 0 — —
Great Western Railway 8 6 2 14 57% —
Greater Anglia 4 3 0 7 57% —
Greater Thameslink Railway 21 4 2 25 84% —
Heathrow Express 0 0 0 0 — —
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 9 0 0 9 100% —
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 0 0 0 0 — —
Northern Trains 1 1 1 2 50% —
ScotRail 0 1 0 1 — —
South Western Railway 6 0 0 6 100% —
Southeastern 16 3 0 19 84% —
TransPennine Trains 3 0 0 3 100% —
Transport for Wales 1 0 0 1 — —
West Midlands Trains 2 1 1 3 66% —

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 0 0 0 0 — —
DB Cargo 3 0 0 3 100% —
Direct Rail Services 0 0 0 0 — —
Freightliner Intermodal 0 0 0 0 — —
GB Railfreight 0 0 0 0 — —
Heavy Haul Rail 1 0 0 1 — —
Network Rail - Materials 13 1 0 14 92% —

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo