Realtime National Passenger Train Stats

Friday, 18 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 09:33:56

On Time

3991

87.3%

Late

579

12.7%

Cancelled / Very Late

297

6.5%

Total

4570

 

National PPM

87%

Rolling: 89%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

112

PPM: 100%

Worst Performing Operator

London North Eastern Railway

On Time

22.8%

Late

77.2%

Cancelled / Very Late

77.2%

Total Trains

57

PPM: 22%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 34 3 0 37 91% 93%
c2c 90 11 2 101 89% 94%
Caledonian Sleeper Limited 2 0 0 2 100%
Chiltern 67 8 5 75 89% 88%
CrossCountry 37 1 0 38 97% 96%
East Midlands Railway 81 9 4 90 90% 89%
Elizabeth line 217 18 10 235 92% 93%
Grand Central 0 0 0 0
Great Western Railway 266 56 21 322 82% 82%
Greater Anglia 252 19 3 271 92% 95%
Greater Thameslink Railway 560 204 109 764 73% 77%
Heathrow Express 15 21 6 36 41% 36%
Hull Trains 1 0 0 1
London North Eastern Railway 13 44 44 57 22% 61%
London Overground 309 7 1 316 97% 97%
Lumo East Coast 1 0 0 1 100% 100%
Lumo West Coast 1 0 0 1 100% 100%
Merseyrail 112 0 0 112 100% 100%
Northern Trains 489 45 28 534 91% 94%
ScotRail 379 26 11 405 93% 94%
South Western Railway 262 47 26 309 84% 83%
Southeastern 388 20 6 408 95% 95%
TransPennine Trains 61 0 0 61 100% 100%
Transport for Wales 170 24 18 194 87% 88%
West Midlands Trains 202 37 9 239 84% 87%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 4 1 0 5 80%
DB Cargo 20 0 0 20 100% 100%
Direct Rail Services 6 0 0 6 100% 100%
Freightliner Intermodal 7 1 0 8 87% 100%
GB Railfreight 23 1 0 24 95% 90%
Heavy Haul Rail 16 4 0 20 80% 71%
Network Rail - Materials 48 4 0 52 92% 75%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo