Realtime National Passenger Train Stats

Saturday, 10 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 22:21:56

On Time

15733

84.0%

Late

3005

16.0%

Cancelled / Very Late

884

4.7%

Total

18738

 

National PPM

83%

Rolling: 80%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

98.6%

Late

1.4%

Cancelled / Very Late

0.0%

Total Trains

138

PPM: 98%

Worst Performing Operator

Avanti West Coast

On Time

33.3%

Late

66.7%

Cancelled / Very Late

51.9%

Total Trains

129

PPM: 33%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 43 86 67 129 33% 55%
c2c 245 12 4 257 95% 90%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 166 20 0 186 89% 79%
CrossCountry 177 79 57 256 69% 73%
East Midlands Railway 380 106 23 486 78% 72%
Elizabeth line 863 50 33 913 94% 100%
Grand Central 13 5 1 18 72% 50%
Great Western Railway 1264 183 46 1447 87% 94%
Greater Anglia 977 100 30 1077 90% 85%
Greater Thameslink Railway 2067 640 127 2707 76% 78%
Heathrow Express 136 2 0 138 98% 100%
Hull Trains 10 2 2 12 83% 100%
London North Eastern Railway 142 33 4 175 81% 85%
London Overground 1258 140 107 1398 89% 89%
Lumo East Coast 9 2 2 11 81% 100%
Lumo West Coast 0 0 0 0 — —
Merseyrail 539 27 7 566 95% 98%
Northern Trains 1968 471 89 2439 80% 71%
ScotRail 1720 215 34 1935 88% 79%
South Western Railway 1256 218 62 1474 85% 90%
Southeastern 725 256 92 981 73% 52%
TransPennine Trains 248 50 9 298 83% 79%
Transport for Wales 892 102 28 994 89% 80%
West Midlands Trains 801 217 65 1018 78% 69%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 15 1 0 16 93% —
DB Cargo 61 4 0 65 93% 100%
Direct Rail Services 11 5 0 16 68% 100%
Freightliner Intermodal 23 5 0 28 82% —
GB Railfreight 59 7 1 66 89% 66%
Heavy Haul Rail 13 0 0 13 100% —
Network Rail - Materials 41 7 0 48 85% 60%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo