Realtime National Passenger Train Stats
Thursday, 19 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 19:15:56
On Time
13502
80.9%
Late
3193
19.1%
Cancelled / Very Late
1080
6.5%
Total
16695
National PPM
80%
Rolling: 72%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Chiltern
On Time
97.6%
Late
2.4%
Cancelled / Very Late
0.0%
Total Trains
247
PPM: 97%
Worst Performing Operator
Grand Central
On Time
7.7%
Late
92.3%
Cancelled / Very Late
69.2%
Total Trains
13
PPM: 7%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 171 | 55 | 6 | 226 | 75% | 50% |
| c2c | 144 | 105 | 69 | 249 | 57% | 3% |
| Caledonian Sleeper Limited | 3 | 0 | 0 | 3 | 100% | — |
| Chiltern | 241 | 6 | 0 | 247 | 97% | 97% |
| CrossCountry | 104 | 85 | 55 | 189 | 55% | 48% |
| East Midlands Railway | 289 | 69 | 19 | 358 | 80% | 70% |
| Elizabeth line | 713 | 71 | 18 | 784 | 90% | 74% |
| Grand Central | 1 | 12 | 9 | 13 | 7% | 0% |
| Great Western Railway | 1023 | 219 | 57 | 1242 | 82% | 78% |
| Greater Anglia | 856 | 99 | 22 | 955 | 89% | 90% |
| Greater Thameslink Railway | 1906 | 608 | 226 | 2514 | 75% | 70% |
| Heathrow Express | 94 | 18 | 5 | 112 | 83% | 62% |
| Hull Trains | 5 | 5 | 3 | 10 | 50% | 50% |
| London North Eastern Railway | 36 | 108 | 97 | 144 | 25% | 16% |
| London Overground | 1078 | 100 | 36 | 1178 | 91% | 88% |
| Lumo East Coast | 2 | 8 | 8 | 10 | 20% | 0% |
| Lumo West Coast | 7 | 0 | 0 | 7 | 100% | 100% |
| Merseyrail | 471 | 10 | 3 | 481 | 97% | 96% |
| Northern Trains | 1411 | 567 | 154 | 1978 | 71% | 58% |
| ScotRail | 1389 | 301 | 132 | 1690 | 82% | 70% |
| South Western Railway | 1003 | 196 | 26 | 1199 | 83% | 77% |
| Southeastern | 1106 | 204 | 18 | 1310 | 84% | 71% |
| TransPennine Trains | 111 | 103 | 64 | 214 | 51% | 30% |
| Transport for Wales | 677 | 95 | 40 | 772 | 87% | 80% |
| West Midlands Trains | 770 | 192 | 38 | 962 | 80% | 70% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 16 | 4 | 4 | 20 | 80% | — |
| DB Cargo | 78 | 15 | 0 | 93 | 83% | 94% |
| Direct Rail Services | 19 | 3 | 0 | 22 | 86% | 100% |
| Freightliner Intermodal | 28 | 8 | 0 | 36 | 77% | 88% |
| GB Railfreight | 74 | 13 | 1 | 87 | 85% | 90% |
| Heavy Haul Rail | 56 | 5 | 0 | 61 | 91% | 100% |
| Network Rail - Materials | 69 | 12 | 0 | 81 | 85% | 80% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By