Realtime National Passenger Train Stats

Monday, 23 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 15:46:56

On Time

10093

83.6%

Late

1981

16.4%

Cancelled / Very Late

598

5.0%

Total

12074

 

National PPM

83%

Rolling: 82%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

97.4%

Late

2.6%

Cancelled / Very Late

0.3%

Total Trains

346

PPM: 97%

Worst Performing Operator

Avanti West Coast

On Time

66.2%

Late

33.8%

Cancelled / Very Late

8.1%

Total Trains

160

PPM: 66%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 106 54 13 160 66% 50%
c2c 146 51 14 197 74% 74%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 135 37 8 172 78% 87%
CrossCountry 108 30 10 138 78% 63%
East Midlands Railway 216 42 12 258 83% 87%
Elizabeth line 547 21 7 568 96% 89%
Grand Central 6 3 0 9 66% 100%
Great Western Railway 811 96 33 907 89% 90%
Greater Anglia 674 27 3 701 96% 97%
Greater Thameslink Railway 1333 480 194 1813 73% 68%
Heathrow Express 81 4 0 85 95% 100%
Hull Trains 3 5 0 8 37% 0%
London North Eastern Railway 71 25 7 96 73% 84%
London Overground 776 65 37 841 92% 86%
Lumo East Coast 4 1 0 5 80% 100%
Lumo West Coast 4 0 0 4 100% 100%
Merseyrail 337 9 1 346 97% 100%
Northern Trains 1178 264 80 1442 81% 81%
ScotRail 964 225 63 1189 81% 85%
South Western Railway 644 235 47 879 73% 75%
Southeastern 838 101 7 939 89% 91%
TransPennine Trains 134 21 3 155 86% 84%
Transport for Wales 517 56 28 573 90% 90%
West Midlands Trains 556 142 31 698 79% 70%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 10 2 1 12 83% 100%
DB Cargo 67 10 0 77 87% 88%
Direct Rail Services 11 2 0 13 84% 75%
Freightliner Intermodal 10 3 0 13 76% 66%
GB Railfreight 42 13 1 55 76% 83%
Heavy Haul Rail 27 10 0 37 72% 64%
Network Rail - Materials 43 7 0 50 86% 83%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo