Realtime National Passenger Train Stats

Tuesday, 3 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 16:37:57

On Time

10139

78.3%

Late

2803

21.7%

Cancelled / Very Late

918

7.1%

Total

12942

 

National PPM

78%

Rolling: 77%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

96.8%

Late

3.2%

Cancelled / Very Late

1.6%

Total Trains

378

PPM: 96%

Worst Performing Operator

Grand Central

On Time

41.7%

Late

58.3%

Cancelled / Very Late

0.0%

Total Trains

12

PPM: 41%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 90 92 45 182 49% 9%
c2c 113 41 13 154 73% 56%
Caledonian Sleeper Limited 2 1 0 3 66% —
Chiltern 146 52 1 198 73% 85%
CrossCountry 111 39 25 150 74% 61%
East Midlands Railway 248 41 13 289 85% 84%
Elizabeth line 375 216 107 591 63% 71%
Grand Central 5 7 0 12 41% 33%
Great Western Railway 706 242 63 948 74% 70%
Greater Anglia 718 33 5 751 95% 97%
Greater Thameslink Railway 1551 416 104 1967 78% 80%
Heathrow Express 64 31 5 95 67% 72%
Hull Trains 6 2 0 8 75% 50%
London North Eastern Railway 83 25 5 108 76% 54%
London Overground 835 47 25 882 94% 97%
Lumo East Coast 5 1 0 6 83% 100%
Lumo West Coast 2 3 1 5 40% 0%
Merseyrail 366 12 6 378 96% 96%
Northern Trains 1260 320 56 1580 79% 78%
ScotRail 1057 249 76 1306 80% 70%
South Western Railway 708 208 52 916 77% 84%
Southeastern 546 478 222 1024 53% 59%
TransPennine Trains 141 35 14 176 80% 66%
Transport for Wales 542 81 30 623 86% 94%
West Midlands Trains 541 175 56 716 75% 61%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 11 5 1 16 68% 75%
DB Cargo 61 7 0 68 89% 75%
Direct Rail Services 15 3 0 18 83% 75%
Freightliner Intermodal 18 6 0 24 75% 66%
GB Railfreight 52 11 1 63 82% 71%
Heavy Haul Rail 52 7 0 59 88% 84%
Network Rail - Materials 61 14 0 75 81% 60%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo