Realtime National Passenger Train Stats
Tuesday, 29 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 22:25:56
On Time
17699
85.6%
Late
2972
14.4%
Cancelled / Very Late
779
3.8%
Total
20671
National PPM
85%
Rolling: 82%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
98.1%
Late
1.9%
Cancelled / Very Late
0.5%
Total Trains
570
PPM: 98%
Worst Performing Operator
Chiltern
On Time
58.4%
Late
41.6%
Cancelled / Very Late
18.1%
Total Trains
315
PPM: 58%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 232 | 54 | 13 | 286 | 81% | 86% |
| c2c | 246 | 87 | 15 | 333 | 73% | 79% |
| Caledonian Sleeper Limited | 2 | 1 | 1 | 3 | 66% | — |
| Chiltern | 184 | 131 | 57 | 315 | 58% | 40% |
| CrossCountry | 185 | 59 | 20 | 244 | 75% | 57% |
| East Midlands Railway | 379 | 67 | 29 | 446 | 84% | 75% |
| Elizabeth line | 939 | 27 | 2 | 966 | 97% | 100% |
| Grand Central | 11 | 7 | 3 | 18 | 61% | 50% |
| Great Western Railway | 1321 | 242 | 62 | 1563 | 84% | 89% |
| Greater Anglia | 1051 | 121 | 30 | 1172 | 89% | 74% |
| Greater Thameslink Railway | 2236 | 810 | 200 | 3046 | 73% | 69% |
| Heathrow Express | 122 | 16 | 2 | 138 | 88% | 100% |
| Hull Trains | 12 | 2 | 0 | 14 | 85% | 50% |
| London North Eastern Railway | 145 | 28 | 2 | 173 | 83% | 24% |
| London Overground | 1372 | 73 | 48 | 1445 | 94% | 80% |
| Lumo East Coast | 8 | 2 | 1 | 10 | 80% | 100% |
| Lumo West Coast | 7 | 1 | 0 | 8 | 87% | 100% |
| Merseyrail | 559 | 11 | 3 | 570 | 98% | 100% |
| Northern Trains | 2193 | 326 | 57 | 2519 | 87% | 89% |
| ScotRail | 1918 | 132 | 35 | 2050 | 93% | 93% |
| South Western Railway | 1232 | 258 | 74 | 1490 | 82% | 84% |
| Southeastern | 1418 | 216 | 29 | 1634 | 86% | 84% |
| TransPennine Trains | 274 | 32 | 16 | 306 | 89% | 90% |
| Transport for Wales | 851 | 95 | 25 | 946 | 89% | 85% |
| West Midlands Trains | 962 | 202 | 61 | 1164 | 82% | 78% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 28 | 2 | 0 | 30 | 93% | 100% |
| DB Cargo | 93 | 12 | 0 | 105 | 88% | 100% |
| Direct Rail Services | 23 | 2 | 0 | 25 | 92% | 100% |
| Freightliner Intermodal | 43 | 8 | 0 | 51 | 84% | 100% |
| GB Railfreight | 83 | 11 | 0 | 94 | 88% | 83% |
| Heavy Haul Rail | 76 | 5 | 0 | 81 | 93% | 100% |
| Network Rail - Materials | 77 | 8 | 0 | 85 | 90% | 100% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By