Realtime National Passenger Train Stats

Friday, 23 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 05:51:56

On Time

208

75.9%

Late

66

24.1%

Cancelled / Very Late

44

16.1%

Total

274

 

National PPM

75%

Rolling: 75%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

11

PPM: 100%

Worst Performing Operator

South Western Railway

On Time

50.0%

Late

50.0%

Cancelled / Very Late

42.9%

Total Trains

14

PPM: 50%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0 — —
c2c 10 3 2 13 76% 60%
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 4 0 0 4 100% —
CrossCountry 1 1 1 2 50% 50%
East Midlands Railway 0 0 0 0 — —
Elizabeth line 11 0 0 11 100% 100%
Grand Central 0 0 0 0 — —
Great Western Railway 26 8 6 34 76% 84%
Greater Anglia 19 1 0 20 95% 100%
Greater Thameslink Railway 57 28 21 85 67% 61%
Heathrow Express 6 0 0 6 100% 100%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 12 2 0 14 85% 100%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 0 0 0 0 — —
Northern Trains 3 4 4 7 42% 33%
ScotRail 2 0 0 2 100% —
South Western Railway 7 7 6 14 50% 42%
Southeastern 31 4 1 35 88% 100%
TransPennine Trains 11 2 0 13 84% 83%
Transport for Wales 8 3 1 11 72% 77%
West Midlands Trains 6 3 2 9 66% 75%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 1 0 0 1 — —
DB Cargo 10 0 0 10 100% 100%
Direct Rail Services 1 0 0 1 — —
Freightliner Intermodal 2 0 0 2 100% 100%
GB Railfreight 4 0 0 4 100% 100%
Heavy Haul Rail 11 0 0 11 100% 100%
Network Rail - Materials 21 2 0 23 91% 88%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo