Realtime National Passenger Train Stats

Wednesday, 14 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 00:24:56

On Time

18573

82.7%

Late

3895

17.3%

Cancelled / Very Late

946

4.2%

Total

22468

 

National PPM

82%

Rolling: 84%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

97.1%

Late

2.9%

Cancelled / Very Late

1.9%

Total Trains

617

PPM: 97%

Worst Performing Operator

Grand Central

On Time

45.0%

Late

55.0%

Cancelled / Very Late

20.0%

Total Trains

20

PPM: 45%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 211 100 32 311 67% 76%
c2c 258 103 6 361 71% 83%
Caledonian Sleeper Limited 4 0 0 4 100% —
Chiltern 308 37 4 345 89% 100%
CrossCountry 165 110 47 275 60% 51%
East Midlands Railway 346 144 34 490 70% 70%
Elizabeth line 1002 44 5 1046 95% 96%
Grand Central 9 11 4 20 45% 0%
Great Western Railway 1439 223 64 1662 86% 88%
Greater Anglia 1208 81 7 1289 93% 92%
Greater Thameslink Railway 2480 842 237 3322 74% 72%
Heathrow Express 147 5 0 152 96% 100%
Hull Trains 7 8 4 15 46% 0%
London North Eastern Railway 125 64 25 189 66% 18%
London Overground 1501 95 46 1596 94% 89%
Lumo East Coast 7 3 2 10 70% —
Lumo West Coast 8 2 0 10 80% 100%
Merseyrail 599 18 12 617 97% 96%
Northern Trains 2178 540 101 2718 80% 86%
ScotRail 1885 295 41 2180 86% 89%
South Western Railway 1343 293 77 1636 82% 89%
Southeastern 1297 476 97 1773 73% 75%
TransPennine Trains 249 59 18 308 80% 68%
Transport for Wales 934 108 42 1042 89% 88%
West Midlands Trains 1041 263 51 1304 79% 91%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 29 2 0 31 93% 83%
DB Cargo 97 8 0 105 92% 100%
Direct Rail Services 24 5 0 29 82% 100%
Freightliner Intermodal 48 8 0 56 85% 100%
GB Railfreight 89 26 0 115 77% 84%
Heavy Haul Rail 66 10 0 76 86% 100%
Network Rail - Materials 122 25 0 147 82% 84%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo