Realtime National Passenger Train Stats
Tuesday, 29 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 02:35:57
On Time
91
82.0%
Late
20
18.0%
Cancelled / Very Late
7
6.3%
Total
111
National PPM
81%
Rolling: —
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Southeastern
On Time
90.9%
Late
9.1%
Cancelled / Very Late
4.5%
Total Trains
22
PPM: 90%
Worst Performing Operator
Greater Thameslink Railway
On Time
75.0%
Late
25.0%
Cancelled / Very Late
15.6%
Total Trains
32
PPM: 75%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 0 | 0 | 0 | 0 | — | — |
| c2c | 2 | 3 | 1 | 5 | 40% | — |
| Caledonian Sleeper Limited | 0 | 0 | 0 | 0 | — | — |
| Chiltern | 4 | 0 | 0 | 4 | 100% | — |
| CrossCountry | 0 | 0 | 0 | 0 | — | — |
| East Midlands Railway | 0 | 0 | 0 | 0 | — | — |
| Elizabeth line | 4 | 0 | 0 | 4 | 100% | — |
| Grand Central | 0 | 0 | 0 | 0 | — | — |
| Great Western Railway | 11 | 3 | 0 | 14 | 78% | — |
| Greater Anglia | 6 | 2 | 0 | 8 | 75% | — |
| Greater Thameslink Railway | 24 | 8 | 5 | 32 | 75% | — |
| Heathrow Express | 0 | 0 | 0 | 0 | — | — |
| Hull Trains | 0 | 0 | 0 | 0 | — | — |
| London North Eastern Railway | 0 | 0 | 0 | 0 | — | — |
| London Overground | 5 | 1 | 0 | 6 | 83% | — |
| Lumo East Coast | 0 | 0 | 0 | 0 | — | — |
| Lumo West Coast | 0 | 0 | 0 | 0 | — | — |
| Merseyrail | 0 | 0 | 0 | 0 | — | — |
| Northern Trains | 2 | 0 | 0 | 2 | 100% | — |
| ScotRail | 1 | 0 | 0 | 1 | — | — |
| South Western Railway | 6 | 0 | 0 | 6 | 100% | — |
| Southeastern | 20 | 2 | 1 | 22 | 90% | — |
| TransPennine Trains | 3 | 0 | 0 | 3 | 100% | — |
| Transport for Wales | 1 | 0 | 0 | 1 | — | — |
| West Midlands Trains | 2 | 1 | 0 | 3 | 66% | — |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 0 | 0 | 0 | 0 | — | — |
| DB Cargo | 2 | 0 | 0 | 2 | 100% | — |
| Direct Rail Services | 0 | 0 | 0 | 0 | — | — |
| Freightliner Intermodal | 0 | 0 | 0 | 0 | — | — |
| GB Railfreight | 0 | 0 | 0 | 0 | — | — |
| Heavy Haul Rail | 1 | 0 | 0 | 1 | — | — |
| Network Rail - Materials | 11 | 1 | 0 | 12 | 91% | — |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By