Realtime National Passenger Train Stats

Sunday, 20 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 22:29:56

On Time

9709

85.3%

Late

1677

14.7%

Cancelled / Very Late

557

4.9%

Total

11386

 

National PPM

85%

Rolling: 81%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Hull Trains

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

11

PPM: 100%

Worst Performing Operator

CrossCountry

On Time

48.6%

Late

51.4%

Cancelled / Very Late

37.2%

Total Trains

148

PPM: 48%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 120 31 7 151 79% 80%
c2c 110 24 3 134 82% 83%
Caledonian Sleeper Limited 0 0 0 0
Chiltern 132 6 1 138 95% 95%
CrossCountry 72 76 55 148 48% 36%
East Midlands Railway 160 51 8 211 75% 76%
Elizabeth line 708 18 0 726 97% 95%
Grand Central 16 1 0 17 94% 75%
Great Western Railway 509 266 130 775 65% 56%
Greater Anglia 702 67 2 769 91% 82%
Greater Thameslink Railway 1510 323 41 1833 82% 84%
Heathrow Express 121 17 2 138 87% 81%
Hull Trains 11 0 0 11 100% 100%
London North Eastern Railway 119 9 0 128 92% 83%
London Overground 990 79 59 1069 92% 90%
Lumo East Coast 9 0 0 9 100% 100%
Lumo West Coast 4 0 0 4 100% 100%
Merseyrail 262 18 10 280 93% 100%
Northern Trains 983 160 60 1143 86% 80%
ScotRail 943 89 23 1032 91% 91%
South Western Railway 486 171 81 657 73% 64%
Southeastern 709 81 6 790 89% 87%
TransPennine Trains 190 31 12 221 85% 69%
Transport for Wales 539 79 19 618 87% 74%
West Midlands Trains 465 98 40 563 82% 76%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 6 7 1 13 46% 50%
DB Cargo 10 3 0 13 76% 66%
Direct Rail Services 2 1 0 3 66% 50%
Freightliner Intermodal 0 0 0 0
GB Railfreight 21 4 0 25 84% 100%
Heavy Haul Rail 0 0 0 0
Network Rail - Materials 78 21 0 99 78% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo