Realtime National Passenger Train Stats

Monday, 31 August 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 06:53:56

On Time

737

89.2%

Late

89

10.8%

Cancelled / Very Late

56

6.8%

Total

826

 

National PPM

89%

Rolling: 90%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

14

PPM: 100%

Worst Performing Operator

East Midlands Railway

On Time

69.2%

Late

30.8%

Cancelled / Very Late

23.1%

Total Trains

13

PPM: 69%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 2 0 0 2 100% 100%
c2c 11 3 2 14 78% 84%
Caledonian Sleeper Limited 0 0 0 0
Chiltern 6 0 0 6 100% 100%
CrossCountry 3 1 1 4 75% 100%
East Midlands Railway 9 4 3 13 69% 69%
Elizabeth line 50 1 0 51 98% 97%
Grand Central 0 0 0 0
Great Western Railway 82 13 7 95 86% 88%
Greater Anglia 60 2 0 62 96% 100%
Greater Thameslink Railway 126 29 15 155 81% 81%
Heathrow Express 14 0 0 14 100% 100%
Hull Trains 0 0 0 0
London North Eastern Railway 4 0 0 4 100% 100%
London Overground 43 2 1 45 95% 97%
Lumo East Coast 0 0 0 0
Lumo West Coast 0 0 0 0
Merseyrail 16 0 0 16 100% 100%
Northern Trains 81 8 6 89 91% 91%
ScotRail 52 4 3 56 92% 92%
South Western Railway 54 4 3 58 93% 92%
Southeastern 48 2 1 50 96% 95%
TransPennine Trains 13 4 4 17 76% 81%
Transport for Wales 44 3 3 47 93% 93%
West Midlands Trains 33 9 7 42 78% 77%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 0 1 1 1
DB Cargo 13 0 0 13 100% 100%
Direct Rail Services 1 0 0 1
Freightliner Intermodal 0 0 0 0
GB Railfreight 2 2 0 4 50% 50%
Heavy Haul Rail 2 1 0 3 66% 100%
Network Rail - Materials 17 2 0 19 89% 88%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo