Realtime National Passenger Train Stats

Thursday, 5 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 15:43:56

On Time

10001

83.5%

Late

1982

16.5%

Cancelled / Very Late

648

5.4%

Total

11983

 

National PPM

83%

Rolling: 87%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

84

PPM: 100%

Worst Performing Operator

London North Eastern Railway

On Time

13.3%

Late

86.7%

Cancelled / Very Late

70.5%

Total Trains

105

PPM: 13%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 125 36 1 161 77% 92%
c2c 121 24 7 145 83% 75%
Caledonian Sleeper Limited 1 2 0 3 33% —
Chiltern 151 28 7 179 84% 76%
CrossCountry 100 37 13 137 72% 73%
East Midlands Railway 220 38 11 258 85% 81%
Elizabeth line 556 11 0 567 98% 99%
Grand Central 2 7 6 9 22% 50%
Great Western Railway 754 158 32 912 82% 85%
Greater Anglia 643 47 23 690 93% 92%
Greater Thameslink Railway 1448 368 136 1816 79% 82%
Heathrow Express 84 0 0 84 100% 100%
Hull Trains 2 5 5 7 28% 100%
London North Eastern Railway 14 91 74 105 13% 25%
London Overground 762 43 18 805 94% 96%
Lumo East Coast 1 4 3 5 20% 0%
Lumo West Coast 3 1 0 4 75% 100%
Merseyrail 340 6 4 346 98% 100%
Northern Trains 1209 228 28 1437 84% 92%
ScotRail 1024 168 30 1192 85% 80%
South Western Railway 711 129 20 840 84% 91%
Southeastern 687 261 69 948 72% 84%
TransPennine Trains 131 28 5 159 82% 87%
Transport for Wales 446 136 95 582 76% 87%
West Midlands Trains 558 143 75 701 79% 92%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 13 4 3 17 76% —
DB Cargo 65 8 0 73 89% 93%
Direct Rail Services 15 1 0 16 93% 100%
Freightliner Intermodal 21 3 0 24 87% 75%
GB Railfreight 45 15 1 60 75% 84%
Heavy Haul Rail 50 2 0 52 96% 91%
Network Rail - Materials 64 3 0 67 95% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo