Realtime National Passenger Train Stats

Wednesday, 25 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 15:05:56

On Time

9814

86.7%

Late

1502

13.3%

Cancelled / Very Late

384

3.4%

Total

11316

 

National PPM

86%

Rolling: 89%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

99.4%

Late

0.6%

Cancelled / Very Late

0.0%

Total Trains

321

PPM: 99%

Worst Performing Operator

CrossCountry

On Time

62.4%

Late

37.6%

Cancelled / Very Late

27.1%

Total Trains

133

PPM: 62%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 120 25 1 145 82% 72%
c2c 163 26 10 189 86% 93%
Caledonian Sleeper Limited 2 1 1 3 66% —
Chiltern 157 10 0 167 94% 97%
CrossCountry 83 50 36 133 62% 62%
East Midlands Railway 212 29 5 241 87% 91%
Elizabeth line 510 21 12 531 96% 99%
Grand Central 7 2 0 9 77% 100%
Great Western Railway 751 107 27 858 87% 90%
Greater Anglia 606 41 13 647 93% 96%
Greater Thameslink Railway 1419 288 49 1707 83% 87%
Heathrow Express 76 4 0 80 95% 100%
Hull Trains 4 3 2 7 57% 100%
London North Eastern Railway 80 9 3 89 89% 96%
London Overground 751 27 16 778 96% 93%
Lumo East Coast 4 1 0 5 80% 100%
Lumo West Coast 3 0 0 3 100% —
Merseyrail 319 2 0 321 99% 100%
Northern Trains 1111 245 51 1356 81% 88%
ScotRail 996 125 40 1121 88% 89%
South Western Railway 656 167 45 823 79% 87%
Southeastern 741 142 15 883 83% 90%
TransPennine Trains 110 40 14 150 73% 84%
Transport for Wales 480 58 18 538 89% 92%
West Midlands Trains 547 89 28 636 86% 82%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 13 0 0 13 100% 100%
DB Cargo 70 6 0 76 92% 94%
Direct Rail Services 15 0 0 15 100% 100%
Freightliner Intermodal 24 4 0 28 85% 83%
GB Railfreight 44 14 1 58 75% 78%
Heavy Haul Rail 39 7 0 46 84% 90%
Network Rail - Materials 71 8 0 79 89% 88%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo