Realtime National Passenger Train Stats

Monday, 21 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 22:23:56

On Time

16975

82.8%

Late

3531

17.2%

Cancelled / Very Late

1099

5.4%

Total

20506

 

National PPM

82%

Rolling: 80%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

98.2%

Late

1.8%

Cancelled / Very Late

1.6%

Total Trains

568

PPM: 98%

Worst Performing Operator

CrossCountry

On Time

52.2%

Late

47.8%

Cancelled / Very Late

23.7%

Total Trains

245

PPM: 52%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 205 76 9 281 72% 47%
c2c 257 70 9 327 78% 66%
Caledonian Sleeper Limited 3 0 0 3 100%
Chiltern 244 69 15 313 77% 96%
CrossCountry 128 117 58 245 52% 36%
East Midlands Railway 340 104 20 444 76% 61%
Elizabeth line 923 41 4 964 95% 93%
Grand Central 11 7 1 18 61% 100%
Great Western Railway 1301 241 68 1542 84% 84%
Greater Anglia 1080 96 7 1176 91% 88%
Greater Thameslink Railway 2277 754 250 3031 75% 73%
Heathrow Express 128 10 0 138 92% 100%
Hull Trains 12 1 0 13 92% 100%
London North Eastern Railway 121 52 13 173 69% 70%
London Overground 1313 114 58 1427 92% 93%
Lumo East Coast 6 3 1 9 66% 100%
Lumo West Coast 2 6 3 8 25% 0%
Merseyrail 558 10 9 568 98% 100%
Northern Trains 2101 412 81 2513 83% 78%
ScotRail 1801 243 62 2044 88% 89%
South Western Railway 1123 365 173 1488 75% 79%
Southeastern 1354 265 52 1619 83% 83%
TransPennine Trains 253 49 21 302 83% 78%
Transport for Wales 720 142 62 862 83% 71%
West Midlands Trains 873 311 128 1184 73% 80%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 24 3 1 27 88% 50%
DB Cargo 64 8 0 72 88% 90%
Direct Rail Services 17 4 0 21 80% 100%
Freightliner Intermodal 34 5 0 39 87% 100%
GB Railfreight 89 14 0 103 86% 111%
Heavy Haul Rail 46 10 0 56 82% 66%
Network Rail - Materials 52 13 0 65 80% 83%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo