Realtime National Passenger Train Stats

Sunday, 6 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 10:35:56

On Time

1560

88.2%

Late

208

11.8%

Cancelled / Very Late

74

4.2%

Total

1768

 

National PPM

88%

Rolling: 90%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

TransPennine Trains

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

27

PPM: 100%

Worst Performing Operator

CrossCountry

On Time

20.0%

Late

80.0%

Cancelled / Very Late

80.0%

Total Trains

10

PPM: 20%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 2 0 0 2 100% 100%
c2c 29 8 5 37 78% 85%
Caledonian Sleeper Limited 0 0 0 0
Chiltern 19 4 0 23 82% 88%
CrossCountry 2 8 8 10 20% 66%
East Midlands Railway 15 2 0 17 88% 87%
Elizabeth line 96 9 5 105 91% 96%
Grand Central 0 0 0 0
Great Western Railway 71 15 3 86 82% 87%
Greater Anglia 135 10 0 145 93% 94%
Greater Thameslink Railway 307 65 21 372 82% 85%
Heathrow Express 36 7 2 43 83% 84%
Hull Trains 0 0 0 0
London North Eastern Railway 5 0 0 5 100% 100%
London Overground 209 3 1 212 98% 97%
Lumo East Coast 0 0 0 0
Lumo West Coast 0 0 0 0
Merseyrail 41 1 1 42 97% 97%
Northern Trains 107 14 6 121 88% 88%
ScotRail 97 1 0 98 98% 98%
South Western Railway 150 33 14 183 81% 86%
Southeastern 139 21 2 160 86% 83%
TransPennine Trains 27 0 0 27 100% 100%
Transport for Wales 59 9 3 68 86% 86%
West Midlands Trains 50 5 5 55 90% 94%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 1 2 1 3 33% 50%
DB Cargo 2 0 0 2 100%
Direct Rail Services 0 0 0 0
Freightliner Intermodal 0 0 0 0
GB Railfreight 2 0 0 2 100%
Heavy Haul Rail 0 0 0 0
Network Rail - Materials 42 5 0 47 89% 63%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo