Realtime National Passenger Train Stats
Sunday, 18 October 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 22:24:56
On Time
10389
88.0%
Late
1421
12.0%
Cancelled / Very Late
368
3.1%
Total
11810
National PPM
87%
Rolling: 83%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Greater Anglia
On Time
96.9%
Late
3.1%
Cancelled / Very Late
0.4%
Total Trains
717
PPM: 96%
Worst Performing Operator
Grand Central
On Time
50.0%
Late
50.0%
Cancelled / Very Late
20.0%
Total Trains
10
PPM: 50%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 92 | 13 | 3 | 105 | 87% | 80% |
| c2c | 118 | 9 | 3 | 127 | 92% | 85% |
| Caledonian Sleeper Limited | 0 | 0 | 0 | 0 | — | — |
| Chiltern | 168 | 18 | 0 | 186 | 90% | 92% |
| CrossCountry | 105 | 40 | 29 | 145 | 72% | 60% |
| East Midlands Railway | 205 | 43 | 9 | 248 | 82% | 67% |
| Elizabeth line | 585 | 43 | 6 | 628 | 93% | 79% |
| Grand Central | 5 | 5 | 2 | 10 | 50% | 100% |
| Great Western Railway | 681 | 177 | 66 | 858 | 79% | 77% |
| Greater Anglia | 695 | 22 | 3 | 717 | 96% | 93% |
| Greater Thameslink Railway | 1526 | 223 | 30 | 1749 | 87% | 83% |
| Heathrow Express | 72 | 15 | 1 | 87 | 82% | 28% |
| Hull Trains | 2 | 2 | 0 | 4 | 50% | — |
| London North Eastern Railway | 140 | 13 | 2 | 153 | 91% | 100% |
| London Overground | 1122 | 87 | 38 | 1209 | 92% | 85% |
| Lumo East Coast | 6 | 0 | 0 | 6 | 100% | 100% |
| Lumo West Coast | 0 | 0 | 0 | 0 | — | — |
| Merseyrail | 376 | 19 | 2 | 395 | 95% | 94% |
| Northern Trains | 983 | 110 | 25 | 1093 | 89% | 85% |
| ScotRail | 867 | 134 | 35 | 1001 | 86% | 83% |
| South Western Railway | 826 | 200 | 48 | 1026 | 80% | 71% |
| Southeastern | 656 | 97 | 0 | 753 | 87% | 83% |
| TransPennine Trains | 204 | 17 | 5 | 221 | 92% | 84% |
| Transport for Wales | 552 | 69 | 39 | 621 | 88% | 92% |
| West Midlands Trains | 488 | 87 | 25 | 575 | 84% | 83% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 15 | 4 | 2 | 19 | 78% | 66% |
| DB Cargo | 16 | 0 | 0 | 16 | 100% | 100% |
| Direct Rail Services | 3 | 0 | 0 | 3 | 100% | 100% |
| Freightliner Intermodal | 0 | 1 | 0 | 1 | — | — |
| GB Railfreight | 20 | 2 | 0 | 22 | 90% | 100% |
| Heavy Haul Rail | 0 | 0 | 0 | 0 | — | — |
| Network Rail - Materials | 84 | 13 | 0 | 97 | 86% | 100% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By