Realtime National Passenger Train Stats

Thursday, 19 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 23:17:56

On Time

17259

80.2%

Late

4258

19.8%

Cancelled / Very Late

1360

6.3%

Total

21517

 

National PPM

80%

Rolling: 78%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

97.8%

Late

2.2%

Cancelled / Very Late

0.5%

Total Trains

586

PPM: 97%

Worst Performing Operator

Grand Central

On Time

10.5%

Late

89.5%

Cancelled / Very Late

68.4%

Total Trains

19

PPM: 10%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 215 84 9 299 71% 55%
c2c 152 176 117 328 46% 7%
Caledonian Sleeper Limited 3 0 0 3 100% —
Chiltern 303 13 0 316 95% 93%
CrossCountry 130 131 78 261 49% 48%
East Midlands Railway 393 86 23 479 82% 88%
Elizabeth line 910 96 23 1006 90% 93%
Grand Central 2 17 13 19 10% 0%
Great Western Railway 1346 277 64 1623 82% 82%
Greater Anglia 1115 116 24 1231 90% 93%
Greater Thameslink Railway 2440 752 274 3192 76% 82%
Heathrow Express 127 19 5 146 86% 100%
Hull Trains 8 5 3 13 61% 100%
London North Eastern Railway 47 132 108 179 26% 35%
London Overground 1380 134 46 1514 91% 89%
Lumo East Coast 2 9 9 11 18% —
Lumo West Coast 9 1 0 10 90% 100%
Merseyrail 573 13 3 586 97% 95%
Northern Trains 1831 735 176 2566 71% 75%
ScotRail 1741 401 163 2142 81% 77%
South Western Railway 1329 233 30 1562 85% 93%
Southeastern 1345 355 39 1700 79% 56%
TransPennine Trains 150 140 82 290 51% 52%
Transport for Wales 870 131 53 1001 86% 85%
West Midlands Trains 986 253 48 1239 79% 84%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 21 5 5 26 80% —
DB Cargo 94 19 0 113 83% 87%
Direct Rail Services 23 5 0 28 82% 75%
Freightliner Intermodal 34 12 0 46 73% 50%
GB Railfreight 91 20 1 111 81% 86%
Heavy Haul Rail 70 5 0 75 93% 100%
Network Rail - Materials 81 17 0 98 82% 50%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo