Realtime National Passenger Train Stats

Sunday, 22 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 21:16:56

On Time

9449

88.1%

Late

1275

11.9%

Cancelled / Very Late

415

3.9%

Total

10724

 

National PPM

88%

Rolling: 84%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London Overground

On Time

96.6%

Late

3.4%

Cancelled / Very Late

1.8%

Total Trains

925

PPM: 96%

Worst Performing Operator

CrossCountry

On Time

71.5%

Late

28.5%

Cancelled / Very Late

17.9%

Total Trains

123

PPM: 71%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 149 32 8 181 82% 85%
c2c 139 7 5 146 95% 100%
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 147 11 1 158 93% 92%
CrossCountry 88 35 22 123 71% 80%
East Midlands Railway 178 50 13 228 78% 79%
Elizabeth line 559 84 36 643 86% 77%
Grand Central 12 4 1 16 75% 33%
Great Western Railway 651 129 30 780 83% 68%
Greater Anglia 673 37 14 710 94% 83%
Greater Thameslink Railway 1327 210 83 1537 86% 87%
Heathrow Express 103 26 2 129 79% 87%
Hull Trains 8 1 0 9 88% —
London North Eastern Railway 109 21 5 130 83% 75%
London Overground 894 31 17 925 96% 95%
Lumo East Coast 6 1 1 7 85% 100%
Lumo West Coast 5 0 0 5 100% 100%
Merseyrail 245 11 4 256 95% 82%
Northern Trains 999 149 46 1148 87% 85%
ScotRail 866 75 10 941 92% 89%
South Western Railway 731 129 49 860 85% 79%
Southeastern 645 71 13 716 90% 89%
TransPennine Trains 166 18 6 184 90% 87%
Transport for Wales 493 64 11 557 88% 90%
West Midlands Trains 390 111 42 501 77% 74%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 6 1 0 7 85% —
DB Cargo 12 5 0 17 70% 33%
Direct Rail Services 4 0 0 4 100% —
Freightliner Intermodal 1 0 0 1 — —
GB Railfreight 12 2 0 14 85% 80%
Heavy Haul Rail 1 0 0 1 — —
Network Rail - Materials 71 5 0 76 93% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo