Realtime National Passenger Train Stats
Sunday, 1 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 11:08:57
On Time
1903
86.3%
Late
301
13.7%
Cancelled / Very Late
93
4.2%
Total
2204
National PPM
86%
Rolling: 87%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
96.2%
Late
3.8%
Cancelled / Very Late
3.8%
Total Trains
80
PPM: 96%
Worst Performing Operator
CrossCountry
On Time
36.4%
Late
63.6%
Cancelled / Very Late
54.5%
Total Trains
11
PPM: 36%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 5 | 4 | 2 | 9 | 55% | 55% |
| c2c | 33 | 2 | 0 | 35 | 94% | 93% |
| Caledonian Sleeper Limited | 0 | 0 | 0 | 0 | — | — |
| Chiltern | 26 | 5 | 0 | 31 | 83% | 78% |
| CrossCountry | 4 | 7 | 6 | 11 | 36% | 57% |
| East Midlands Railway | 22 | 7 | 4 | 29 | 75% | 85% |
| Elizabeth line | 126 | 11 | 3 | 137 | 91% | 92% |
| Grand Central | 1 | 0 | 0 | 1 | — | — |
| Great Western Railway | 105 | 13 | 4 | 118 | 88% | 89% |
| Greater Anglia | 174 | 13 | 3 | 187 | 93% | 92% |
| Greater Thameslink Railway | 311 | 83 | 22 | 394 | 78% | 82% |
| Heathrow Express | 37 | 4 | 1 | 41 | 90% | 90% |
| Hull Trains | 1 | 0 | 0 | 1 | — | — |
| London North Eastern Railway | 12 | 1 | 1 | 13 | 92% | 100% |
| London Overground | 219 | 16 | 10 | 235 | 93% | 95% |
| Lumo East Coast | 0 | 0 | 0 | 0 | — | — |
| Lumo West Coast | 0 | 0 | 0 | 0 | — | — |
| Merseyrail | 77 | 3 | 3 | 80 | 96% | 96% |
| Northern Trains | 139 | 33 | 7 | 172 | 80% | 80% |
| ScotRail | 120 | 10 | 1 | 130 | 92% | 91% |
| South Western Railway | 210 | 54 | 10 | 264 | 79% | 75% |
| Southeastern | 185 | 10 | 1 | 195 | 94% | 98% |
| TransPennine Trains | 27 | 2 | 1 | 29 | 93% | 96% |
| Transport for Wales | 65 | 8 | 2 | 73 | 89% | 89% |
| West Midlands Trains | 43 | 19 | 13 | 62 | 69% | 72% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 2 | 1 | 0 | 3 | 66% | — |
| DB Cargo | 0 | 0 | 0 | 0 | — | — |
| Direct Rail Services | 0 | 0 | 0 | 0 | — | — |
| Freightliner Intermodal | 0 | 0 | 0 | 0 | — | — |
| GB Railfreight | 0 | 1 | 0 | 1 | — | — |
| Heavy Haul Rail | 0 | 0 | 0 | 0 | — | — |
| Network Rail - Materials | 49 | 6 | 0 | 55 | 89% | 80% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By