Realtime National Passenger Train Stats

Monday, 23 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 15:09:56

On Time

9464

83.7%

Late

1847

16.3%

Cancelled / Very Late

546

4.8%

Total

11311

 

National PPM

83%

Rolling: 83%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

97.2%

Late

2.8%

Cancelled / Very Late

0.3%

Total Trains

322

PPM: 97%

Worst Performing Operator

Avanti West Coast

On Time

68.0%

Late

32.0%

Cancelled / Very Late

6.8%

Total Trains

147

PPM: 68%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 100 47 10 147 68% 60%
c2c 140 47 13 187 74% 87%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 127 36 8 163 77% 90%
CrossCountry 101 25 7 126 80% 72%
East Midlands Railway 204 36 12 240 85% 94%
Elizabeth line 519 17 6 536 96% 93%
Grand Central 6 3 0 9 66% 100%
Great Western Railway 753 91 33 844 89% 91%
Greater Anglia 628 26 3 654 96% 98%
Greater Thameslink Railway 1265 440 165 1705 74% 75%
Heathrow Express 76 4 0 80 95% 100%
Hull Trains 3 4 0 7 42% 33%
London North Eastern Railway 67 23 6 90 74% 81%
London Overground 733 56 34 789 92% 85%
Lumo East Coast 4 1 0 5 80% 100%
Lumo West Coast 4 0 0 4 100% 100%
Merseyrail 313 9 1 322 97% 98%
Northern Trains 1110 256 79 1366 81% 78%
ScotRail 898 217 61 1115 80% 84%
South Western Railway 600 222 45 822 72% 74%
Southeastern 791 98 6 889 88% 88%
TransPennine Trains 126 19 3 145 86% 89%
Transport for Wales 483 52 25 535 90% 90%
West Midlands Trains 504 130 29 634 79% 72%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 9 2 1 11 81% 100%
DB Cargo 64 8 0 72 88% 94%
Direct Rail Services 11 2 0 13 84% 83%
Freightliner Intermodal 10 2 0 12 83% 75%
GB Railfreight 37 12 1 49 75% 71%
Heavy Haul Rail 26 9 0 35 74% 71%
Network Rail - Materials 43 6 0 49 87% 85%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo