Realtime National Passenger Train Stats

Thursday, 19 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 05:59:56

On Time

257

79.3%

Late

67

20.7%

Cancelled / Very Late

41

12.7%

Total

324

 

National PPM

79%

Rolling: 78%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

15

PPM: 100%

Worst Performing Operator

c2c

On Time

41.7%

Late

58.3%

Cancelled / Very Late

33.3%

Total Trains

12

PPM: 41%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 1 1 1 — —
c2c 5 7 4 12 41% 42%
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 4 0 0 4 100% —
CrossCountry 0 6 5 6 0% 0%
East Midlands Railway 2 1 1 3 66% 50%
Elizabeth line 15 0 0 15 100% 100%
Grand Central 0 0 0 0 — —
Great Western Railway 29 11 6 40 72% 91%
Greater Anglia 20 3 0 23 86% 93%
Greater Thameslink Railway 71 15 8 86 82% 79%
Heathrow Express 7 0 0 7 100% 100%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 14 0 0 14 100% 100%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 0 0 0 0 — —
Northern Trains 7 7 7 14 50% 50%
ScotRail 3 1 1 4 75% 66%
South Western Railway 11 1 1 12 91% 80%
Southeastern 39 7 3 46 84% 85%
TransPennine Trains 11 4 2 15 73% 60%
Transport for Wales 16 2 2 18 88% 87%
West Midlands Trains 10 1 0 11 90% 85%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 0 1 1 1 — —
DB Cargo 6 0 0 6 100% 100%
Direct Rail Services 1 0 0 1 — —
Freightliner Intermodal 3 0 0 3 100% 100%
GB Railfreight 3 0 0 3 100% 100%
Heavy Haul Rail 10 0 0 10 100% 100%
Network Rail - Materials 23 1 0 24 95% 94%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo