Realtime National Passenger Train Stats

Saturday, 19 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 09:29:56

On Time

3363

91.8%

Late

299

8.2%

Cancelled / Very Late

135

3.7%

Total

3662

 

National PPM

91%

Rolling: 92%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London Overground

On Time

98.3%

Late

1.7%

Cancelled / Very Late

1.7%

Total Trains

290

PPM: 98%

Worst Performing Operator

c2c

On Time

64.2%

Late

35.8%

Cancelled / Very Late

32.1%

Total Trains

53

PPM: 64%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 25 3 1 28 89% 91%
c2c 34 19 17 53 64% 64%
Caledonian Sleeper Limited 2 0 0 2 100%
Chiltern 36 1 1 37 97% 100%
CrossCountry 33 13 12 46 71% 79%
East Midlands Railway 59 7 3 66 89% 88%
Elizabeth line 165 4 0 169 97% 96%
Grand Central 0 0 0 0
Great Western Railway 242 22 11 264 91% 90%
Greater Anglia 226 12 2 238 94% 96%
Greater Thameslink Railway 485 70 31 555 87% 91%
Heathrow Express 34 1 0 35 97% 100%
Hull Trains 1 0 0 1
London North Eastern Railway 16 8 6 24 66% 60%
London Overground 285 5 5 290 98% 100%
Lumo East Coast 1 0 0 1 100% 100%
Lumo West Coast 1 0 0 1 100% 100%
Merseyrail 106 3 3 109 97% 97%
Northern Trains 446 48 21 494 90% 89%
ScotRail 335 7 2 342 97% 98%
South Western Railway 243 23 5 266 91% 93%
Southeastern 220 18 0 238 92% 94%
TransPennine Trains 59 1 1 60 98% 100%
Transport for Wales 176 27 13 203 86% 84%
West Midlands Trains 170 8 1 178 95% 98%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 3 1 1 4 75%
DB Cargo 18 6 0 24 75% 75%
Direct Rail Services 4 1 0 5 80% 50%
Freightliner Intermodal 10 1 0 11 90% 100%
GB Railfreight 16 1 0 17 94% 100%
Heavy Haul Rail 7 0 0 7 100% 100%
Network Rail - Materials 16 2 0 18 88%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo