Realtime National Passenger Train Stats

Saturday, 5 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 05:20:56

On Time

200

73.3%

Late

73

26.7%

Cancelled / Very Late

40

14.7%

Total

273

 

National PPM

73%

Rolling: 73%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

South Western Railway

On Time

94.7%

Late

5.3%

Cancelled / Very Late

0.0%

Total Trains

19

PPM: 94%

Worst Performing Operator

Greater Anglia

On Time

53.2%

Late

46.8%

Cancelled / Very Late

44.7%

Total Trains

47

PPM: 53%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0
c2c 1 3 0 4 25%
Caledonian Sleeper Limited 0 0 0 0
Chiltern 4 0 0 4 100%
CrossCountry 1 0 0 1
East Midlands Railway 0 2 2 2 0% 0%
Elizabeth line 7 3 0 10 70% 40%
Grand Central 0 0 0 0
Great Western Railway 16 6 0 22 72% 100%
Greater Anglia 25 22 21 47 53% 60%
Greater Thameslink Railway 37 17 10 54 68% 72%
Heathrow Express 2 0 0 2 100% 100%
Hull Trains 0 0 0 0
London North Eastern Railway 0 0 0 0
London Overground 46 3 0 49 93% 100%
Lumo East Coast 0 0 0 0
Lumo West Coast 0 0 0 0
Merseyrail 0 0 0 0
Northern Trains 1 6 6 7 14% 0%
ScotRail 0 1 0 1
South Western Railway 18 1 0 19 94% 100%
Southeastern 14 8 1 22 63%
TransPennine Trains 16 1 0 17 94% 100%
Transport for Wales 9 0 0 9 100% 100%
West Midlands Trains 5 0 0 5 100%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 0 0 0 0
DB Cargo 7 2 0 9 77% 85%
Direct Rail Services 1 0 0 1
Freightliner Intermodal 1 0 0 1
GB Railfreight 2 1 0 3 66%
Heavy Haul Rail 5 0 0 5 100%
Network Rail - Materials 6 0 0 6 100% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo