Realtime National Passenger Train Stats

Wednesday, 25 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 18:45:56

On Time

13807

85.9%

Late

2263

14.1%

Cancelled / Very Late

580

3.6%

Total

16070

 

National PPM

85%

Rolling: 79%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

99.6%

Late

0.4%

Cancelled / Very Late

0.0%

Total Trains

460

PPM: 99%

Worst Performing Operator

CrossCountry

On Time

61.3%

Late

38.7%

Cancelled / Very Late

29.8%

Total Trains

191

PPM: 61%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 183 34 2 217 84% 92%
c2c 224 40 13 264 84% 77%
Caledonian Sleeper Limited 2 1 1 3 66% —
Chiltern 229 11 1 240 95% 100%
CrossCountry 117 74 57 191 61% 64%
East Midlands Railway 297 45 6 342 86% 78%
Elizabeth line 685 57 14 742 92% 71%
Grand Central 12 2 0 14 85% 100%
Great Western Railway 1078 143 43 1221 88% 86%
Greater Anglia 851 63 14 914 93% 90%
Greater Thameslink Railway 2009 389 67 2398 83% 82%
Heathrow Express 102 7 0 109 93% 93%
Hull Trains 7 3 2 10 70% 100%
London North Eastern Railway 112 21 5 133 84% 74%
London Overground 1035 87 52 1122 92% 80%
Lumo East Coast 6 1 0 7 85% 100%
Lumo West Coast 5 1 0 6 83% 100%
Merseyrail 458 2 0 460 99% 100%
Northern Trains 1588 338 63 1926 82% 79%
ScotRail 1448 176 45 1624 89% 86%
South Western Railway 886 275 85 1161 76% 50%
Southeastern 1013 228 23 1241 81% 67%
TransPennine Trains 158 50 16 208 75% 78%
Transport for Wales 673 83 35 756 89% 90%
West Midlands Trains 761 146 38 907 83% 71%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 19 0 0 19 100% 100%
DB Cargo 91 11 0 102 89% 88%
Direct Rail Services 19 0 0 19 100% 100%
Freightliner Intermodal 34 7 0 41 82% 77%
GB Railfreight 59 19 1 78 75% 71%
Heavy Haul Rail 59 9 0 68 86% 90%
Network Rail - Materials 75 10 0 85 88% 66%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo