Last updated: 23:53:56

On Time

17118

77.8%

Late

4874

22.2%

Cancelled / Very Late

1681

7.6%

Total

21992

 

National PPM

77%

Rolling: 77%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

96.7%

Late

3.3%

Cancelled / Very Late

0.0%

Total Trains

150

PPM: 96%

Worst Performing Operator

c2c

On Time

41.0%

Late

59.0%

Cancelled / Very Late

46.5%

Total Trains

344

PPM: 40%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 201 104 5 305 65% 56%
c2c 141 203 160 344 40% 57%
Caledonian Sleeper Limited 2 1 0 3 66% —
Chiltern 265 55 45 320 82% 100%
CrossCountry 165 107 57 272 60% 53%
East Midlands Railway 346 144 49 490 70% 73%
Elizabeth line 883 141 50 1024 86% 97%
Grand Central 9 11 1 20 45% 100%
Great Western Railway 1456 214 34 1670 87% 84%
Greater Anglia 1118 112 2 1230 90% 91%
Greater Thameslink Railway 2314 942 457 3256 71% 81%
Heathrow Express 145 5 0 150 96% 100%
Hull Trains 12 3 2 15 80% 100%
London North Eastern Railway 118 70 39 188 62% 65%
London Overground 1439 118 52 1557 92% 93%
Lumo East Coast 7 4 3 11 63% 100%
Lumo West Coast 6 4 4 10 60% 66%
Merseyrail 586 20 12 606 96% 100%
Northern Trains 2039 605 96 2644 77% 76%
ScotRail 1800 396 105 2196 81% 88%
South Western Railway 1187 407 116 1594 74% 79%
Southeastern 1096 620 189 1716 63% 30%
TransPennine Trains 206 88 25 294 70% 72%
Transport for Wales 854 170 53 1024 83% 79%
West Midlands Trains 902 357 135 1259 71% 69%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 24 7 6 31 77% 100%
DB Cargo 99 14 0 113 87% 90%
Direct Rail Services 13 4 0 17 76% 100%
Freightliner Intermodal 35 6 0 41 85% 100%
GB Railfreight 86 29 1 115 74% 77%
Heavy Haul Rail 51 16 0 67 76% 66%
Network Rail - Materials 79 14 0 93 84% 85%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo