Realtime National Passenger Train Stats
Saturday, 5 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 10:28:56
On Time
4390
89.6%
Late
508
10.4%
Cancelled / Very Late
190
3.9%
Total
4898
National PPM
89%
Rolling: 90%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
TransPennine Trains
On Time
98.2%
Late
1.8%
Cancelled / Very Late
0.0%
Total Trains
111
PPM: 98%
Worst Performing Operator
Greater Thameslink Railway
On Time
74.1%
Late
25.9%
Cancelled / Very Late
8.5%
Total Trains
707
PPM: 74%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 41 | 5 | 0 | 46 | 89% | 88% |
| c2c | 50 | 3 | 0 | 53 | 94% | 100% |
| Caledonian Sleeper Limited | 3 | 0 | 0 | 3 | 100% | — |
| Chiltern | 47 | 2 | 0 | 49 | 95% | 92% |
| CrossCountry | 39 | 5 | 0 | 44 | 88% | 82% |
| East Midlands Railway | 98 | 14 | 3 | 112 | 87% | 88% |
| Elizabeth line | 220 | 5 | 0 | 225 | 97% | 99% |
| Grand Central | 0 | 0 | 0 | 0 | — | — |
| Great Western Railway | 300 | 31 | 16 | 331 | 90% | 88% |
| Greater Anglia | 289 | 45 | 37 | 334 | 86% | 93% |
| Greater Thameslink Railway | 524 | 183 | 60 | 707 | 74% | 75% |
| Heathrow Express | 41 | 1 | 0 | 42 | 97% | 93% |
| Hull Trains | 2 | 0 | 0 | 2 | 100% | 100% |
| London North Eastern Railway | 23 | 5 | 4 | 28 | 82% | 78% |
| London Overground | 341 | 27 | 6 | 368 | 92% | 94% |
| Lumo East Coast | 2 | 0 | 0 | 2 | 100% | 100% |
| Lumo West Coast | 1 | 0 | 0 | 1 | 100% | 100% |
| Merseyrail | 142 | 3 | 3 | 145 | 97% | 96% |
| Northern Trains | 603 | 35 | 19 | 638 | 94% | 96% |
| ScotRail | 450 | 16 | 1 | 466 | 96% | 98% |
| South Western Railway | 321 | 41 | 7 | 362 | 88% | 85% |
| Southeastern | 304 | 27 | 8 | 331 | 91% | 93% |
| TransPennine Trains | 109 | 2 | 0 | 111 | 98% | 100% |
| Transport for Wales | 233 | 22 | 16 | 255 | 91% | 85% |
| West Midlands Trains | 253 | 37 | 10 | 290 | 87% | 84% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 4 | 0 | 0 | 4 | 100% | — |
| DB Cargo | 22 | 6 | 0 | 28 | 78% | 85% |
| Direct Rail Services | 6 | 0 | 0 | 6 | 100% | 100% |
| Freightliner Intermodal | 9 | 1 | 0 | 10 | 90% | 50% |
| GB Railfreight | 18 | 3 | 0 | 21 | 85% | 77% |
| Heavy Haul Rail | 11 | 1 | 0 | 12 | 91% | 66% |
| Network Rail - Materials | 11 | 3 | 0 | 14 | 78% | 50% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By