Realtime National Passenger Train Stats
Thursday, 12 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 23:51:57
On Time
17041
77.8%
Late
4853
22.2%
Cancelled / Very Late
1435
6.6%
Total
21894
National PPM
77%
Rolling: 78%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
94.4%
Late
5.6%
Cancelled / Very Late
1.9%
Total Trains
590
PPM: 94%
Worst Performing Operator
Grand Central
On Time
40.0%
Late
60.0%
Cancelled / Very Late
15.0%
Total Trains
20
PPM: 40%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 222 | 81 | 5 | 303 | 73% | 82% |
| c2c | 285 | 68 | 14 | 353 | 80% | 89% |
| Caledonian Sleeper Limited | 3 | 0 | 0 | 3 | 100% | — |
| Chiltern | 180 | 136 | 60 | 316 | 56% | 81% |
| CrossCountry | 197 | 76 | 27 | 273 | 72% | 76% |
| East Midlands Railway | 391 | 93 | 10 | 484 | 80% | 70% |
| Elizabeth line | 911 | 109 | 28 | 1020 | 89% | 71% |
| Grand Central | 8 | 12 | 3 | 20 | 40% | 50% |
| Great Western Railway | 1384 | 242 | 74 | 1626 | 85% | 67% |
| Greater Anglia | 1069 | 191 | 72 | 1260 | 84% | 87% |
| Greater Thameslink Railway | 2083 | 1180 | 424 | 3263 | 63% | 71% |
| Heathrow Express | 132 | 12 | 0 | 144 | 91% | 30% |
| Hull Trains | 13 | 1 | 0 | 14 | 92% | 66% |
| London North Eastern Railway | 151 | 39 | 3 | 190 | 79% | 90% |
| London Overground | 1307 | 207 | 92 | 1514 | 86% | 87% |
| Lumo East Coast | 8 | 3 | 2 | 11 | 72% | 100% |
| Lumo West Coast | 7 | 3 | 2 | 10 | 70% | 100% |
| Merseyrail | 557 | 33 | 11 | 590 | 94% | 87% |
| Northern Trains | 1808 | 835 | 243 | 2643 | 68% | 71% |
| ScotRail | 1873 | 316 | 34 | 2189 | 85% | 86% |
| South Western Railway | 1268 | 271 | 59 | 1539 | 82% | 76% |
| Southeastern | 1344 | 404 | 48 | 1748 | 76% | 74% |
| TransPennine Trains | 231 | 67 | 21 | 298 | 77% | 70% |
| Transport for Wales | 786 | 219 | 124 | 1005 | 78% | 86% |
| West Midlands Trains | 991 | 286 | 86 | 1277 | 77% | 86% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 19 | 13 | 10 | 32 | 59% | — |
| DB Cargo | 98 | 17 | 0 | 115 | 85% | 70% |
| Direct Rail Services | 22 | 6 | 0 | 28 | 78% | 75% |
| Freightliner Intermodal | 44 | 13 | 0 | 57 | 77% | 66% |
| GB Railfreight | 106 | 20 | 1 | 126 | 84% | 71% |
| Heavy Haul Rail | 70 | 13 | 0 | 83 | 84% | 80% |
| Network Rail - Materials | 79 | 11 | 0 | 90 | 87% | 81% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By