Realtime National Passenger Train Stats

Thursday, 12 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 23:51:57

On Time

17041

77.8%

Late

4853

22.2%

Cancelled / Very Late

1435

6.6%

Total

21894

 

National PPM

77%

Rolling: 78%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

94.4%

Late

5.6%

Cancelled / Very Late

1.9%

Total Trains

590

PPM: 94%

Worst Performing Operator

Grand Central

On Time

40.0%

Late

60.0%

Cancelled / Very Late

15.0%

Total Trains

20

PPM: 40%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 222 81 5 303 73% 82%
c2c 285 68 14 353 80% 89%
Caledonian Sleeper Limited 3 0 0 3 100% —
Chiltern 180 136 60 316 56% 81%
CrossCountry 197 76 27 273 72% 76%
East Midlands Railway 391 93 10 484 80% 70%
Elizabeth line 911 109 28 1020 89% 71%
Grand Central 8 12 3 20 40% 50%
Great Western Railway 1384 242 74 1626 85% 67%
Greater Anglia 1069 191 72 1260 84% 87%
Greater Thameslink Railway 2083 1180 424 3263 63% 71%
Heathrow Express 132 12 0 144 91% 30%
Hull Trains 13 1 0 14 92% 66%
London North Eastern Railway 151 39 3 190 79% 90%
London Overground 1307 207 92 1514 86% 87%
Lumo East Coast 8 3 2 11 72% 100%
Lumo West Coast 7 3 2 10 70% 100%
Merseyrail 557 33 11 590 94% 87%
Northern Trains 1808 835 243 2643 68% 71%
ScotRail 1873 316 34 2189 85% 86%
South Western Railway 1268 271 59 1539 82% 76%
Southeastern 1344 404 48 1748 76% 74%
TransPennine Trains 231 67 21 298 77% 70%
Transport for Wales 786 219 124 1005 78% 86%
West Midlands Trains 991 286 86 1277 77% 86%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 19 13 10 32 59% —
DB Cargo 98 17 0 115 85% 70%
Direct Rail Services 22 6 0 28 78% 75%
Freightliner Intermodal 44 13 0 57 77% 66%
GB Railfreight 106 20 1 126 84% 71%
Heavy Haul Rail 70 13 0 83 84% 80%
Network Rail - Materials 79 11 0 90 87% 81%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo