Realtime National Passenger Train Stats

Friday, 6 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 16:35:56

On Time

11068

85.2%

Late

1926

14.8%

Cancelled / Very Late

544

4.2%

Total

12994

 

National PPM

85%

Rolling: 85%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

96.4%

Late

3.6%

Cancelled / Very Late

0.7%

Total Trains

609

PPM: 96%

Worst Performing Operator

Grand Central

On Time

16.7%

Late

83.3%

Cancelled / Very Late

33.3%

Total Trains

12

PPM: 16%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 134 40 9 174 77% 86%
c2c 124 28 16 152 81% 72%
Caledonian Sleeper Limited 3 0 0 3 100% —
Chiltern 175 20 4 195 89% 96%
CrossCountry 80 67 30 147 54% 48%
East Midlands Railway 239 48 9 287 83% 73%
Elizabeth line 587 22 4 609 96% 100%
Grand Central 2 10 4 12 16% 0%
Great Western Railway 788 203 67 991 79% 82%
Greater Anglia 663 85 17 748 88% 88%
Greater Thameslink Railway 1638 322 93 1960 83% 88%
Heathrow Express 89 3 0 92 96% 93%
Hull Trains 5 2 0 7 71% 50%
London North Eastern Railway 71 34 9 105 67% 60%
London Overground 847 34 27 881 96% 91%
Lumo East Coast 3 3 1 6 50% 0%
Lumo West Coast 5 0 0 5 100% 100%
Merseyrail 346 30 11 376 92% 87%
Northern Trains 1230 338 58 1568 78% 78%
ScotRail 1178 135 35 1313 89% 91%
South Western Railway 775 120 27 895 86% 83%
Southeastern 962 72 10 1034 93% 95%
TransPennine Trains 117 54 25 171 68% 64%
Transport for Wales 525 94 44 619 84% 87%
West Midlands Trains 586 180 49 766 76% 82%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 9 5 1 14 64% 60%
DB Cargo 55 10 0 65 84% 70%
Direct Rail Services 14 0 0 14 100% 100%
Freightliner Intermodal 22 2 0 24 91% 66%
GB Railfreight 58 17 2 75 77% 64%
Heavy Haul Rail 39 4 0 43 90% 87%
Network Rail - Materials 67 10 0 77 87% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo