Realtime National Passenger Train Stats

Monday, 23 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 11:05:56

On Time

5339

83.3%

Late

1073

16.7%

Cancelled / Very Late

292

4.6%

Total

6412

 

National PPM

83%

Rolling: 83%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

96.9%

Late

3.1%

Cancelled / Very Late

1.2%

Total Trains

325

PPM: 96%

Worst Performing Operator

c2c

On Time

65.9%

Late

34.1%

Cancelled / Very Late

10.6%

Total Trains

123

PPM: 65%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 47 19 1 66 71% 79%
c2c 81 42 13 123 65% 71%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 70 27 5 97 72% 75%
CrossCountry 50 12 2 62 80% 86%
East Midlands Railway 109 23 7 132 82% 79%
Elizabeth line 315 10 4 325 96% 99%
Grand Central 1 1 0 2 50% 50%
Great Western Railway 426 49 19 475 89% 92%
Greater Anglia 363 18 3 381 95% 93%
Greater Thameslink Railway 725 289 94 1014 71% 71%
Heathrow Express 45 3 0 48 93% 100%
Hull Trains 1 1 0 2 50% —
London North Eastern Railway 35 5 1 40 87% 79%
London Overground 426 24 12 450 94% 98%
Lumo East Coast 2 1 0 3 66% 66%
Lumo West Coast 1 0 0 1 100% 100%
Merseyrail 160 8 0 168 95% 98%
Northern Trains 616 140 29 756 81% 85%
ScotRail 459 135 44 594 77% 79%
South Western Railway 340 113 29 453 75% 69%
Southeastern 494 54 3 548 90% 82%
TransPennine Trains 71 10 2 81 87% 84%
Transport for Wales 259 33 16 292 88% 86%
West Midlands Trains 291 62 8 353 82% 82%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 5 0 0 5 100% —
DB Cargo 40 6 0 46 86% 88%
Direct Rail Services 5 1 0 6 83% —
Freightliner Intermodal 5 0 0 5 100% 100%
GB Railfreight 23 2 0 25 92% 100%
Heavy Haul Rail 13 3 0 16 81% 100%
Network Rail - Materials 34 4 0 38 89% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo