Realtime National Passenger Train Stats

Tuesday, 24 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 13:46:56

On Time

7876

81.0%

Late

1846

19.0%

Cancelled / Very Late

625

6.4%

Total

9722

 

National PPM

81%

Rolling: 82%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

69

PPM: 100%

Worst Performing Operator

London North Eastern Railway

On Time

22.5%

Late

77.5%

Cancelled / Very Late

75.0%

Total Trains

80

PPM: 22%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 78 38 8 116 67% 64%
c2c 136 32 7 168 80% 93%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 128 16 5 144 88% 94%
CrossCountry 80 28 10 108 74% 72%
East Midlands Railway 190 17 6 207 91% 91%
Elizabeth line 425 40 11 465 91% 97%
Grand Central 0 6 6 6 0% 0%
Great Western Railway 675 75 18 750 90% 86%
Greater Anglia 527 38 1 565 93% 97%
Greater Thameslink Railway 966 517 234 1483 65% 67%
Heathrow Express 69 0 0 69 100% 100%
Hull Trains 0 5 3 5 0% 0%
London North Eastern Railway 18 62 60 80 22% 0%
London Overground 638 39 15 677 94% 98%
Lumo East Coast 1 2 2 3 33% 0%
Lumo West Coast 1 2 1 3 33% 0%
Merseyrail 248 22 12 270 91% 94%
Northern Trains 849 296 83 1145 74% 73%
ScotRail 812 137 22 949 85% 88%
South Western Railway 504 174 54 678 74% 82%
Southeastern 628 143 29 771 81% 75%
TransPennine Trains 87 41 16 128 67% 57%
Transport for Wales 393 68 27 461 85% 89%
West Midlands Trains 492 63 7 555 88% 90%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 6 2 0 8 75% 50%
DB Cargo 44 18 0 62 70% 68%
Direct Rail Services 14 1 0 15 93% 100%
Freightliner Intermodal 23 2 0 25 92% 100%
GB Railfreight 34 6 1 40 85% 83%
Heavy Haul Rail 32 7 0 39 82% 100%
Network Rail - Materials 62 2 0 64 96% 83%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo