Realtime National Passenger Train Stats

Thursday, 19 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 19:15:56

On Time

13502

80.9%

Late

3193

19.1%

Cancelled / Very Late

1080

6.5%

Total

16695

 

National PPM

80%

Rolling: 72%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Chiltern

On Time

97.6%

Late

2.4%

Cancelled / Very Late

0.0%

Total Trains

247

PPM: 97%

Worst Performing Operator

Grand Central

On Time

7.7%

Late

92.3%

Cancelled / Very Late

69.2%

Total Trains

13

PPM: 7%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 171 55 6 226 75% 50%
c2c 144 105 69 249 57% 3%
Caledonian Sleeper Limited 3 0 0 3 100% —
Chiltern 241 6 0 247 97% 97%
CrossCountry 104 85 55 189 55% 48%
East Midlands Railway 289 69 19 358 80% 70%
Elizabeth line 713 71 18 784 90% 74%
Grand Central 1 12 9 13 7% 0%
Great Western Railway 1023 219 57 1242 82% 78%
Greater Anglia 856 99 22 955 89% 90%
Greater Thameslink Railway 1906 608 226 2514 75% 70%
Heathrow Express 94 18 5 112 83% 62%
Hull Trains 5 5 3 10 50% 50%
London North Eastern Railway 36 108 97 144 25% 16%
London Overground 1078 100 36 1178 91% 88%
Lumo East Coast 2 8 8 10 20% 0%
Lumo West Coast 7 0 0 7 100% 100%
Merseyrail 471 10 3 481 97% 96%
Northern Trains 1411 567 154 1978 71% 58%
ScotRail 1389 301 132 1690 82% 70%
South Western Railway 1003 196 26 1199 83% 77%
Southeastern 1106 204 18 1310 84% 71%
TransPennine Trains 111 103 64 214 51% 30%
Transport for Wales 677 95 40 772 87% 80%
West Midlands Trains 770 192 38 962 80% 70%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 16 4 4 20 80% —
DB Cargo 78 15 0 93 83% 94%
Direct Rail Services 19 3 0 22 86% 100%
Freightliner Intermodal 28 8 0 36 77% 88%
GB Railfreight 74 13 1 87 85% 90%
Heavy Haul Rail 56 5 0 61 91% 100%
Network Rail - Materials 69 12 0 81 85% 80%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo