Realtime National Passenger Train Stats
Wednesday, 9 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 10:41:57
On Time
4912
83.7%
Late
959
16.3%
Cancelled / Very Late
314
5.3%
Total
5871
National PPM
83%
Rolling: 79%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
98.1%
Late
1.9%
Cancelled / Very Late
1.3%
Total Trains
154
PPM: 98%
Worst Performing Operator
c2c
On Time
24.6%
Late
75.4%
Cancelled / Very Late
46.2%
Total Trains
65
PPM: 24%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 35 | 18 | 5 | 53 | 66% | 46% |
| c2c | 16 | 49 | 30 | 65 | 24% | 20% |
| Caledonian Sleeper Limited | 3 | 0 | 0 | 3 | 100% | — |
| Chiltern | 96 | 2 | 0 | 98 | 97% | 97% |
| CrossCountry | 35 | 20 | 7 | 55 | 63% | 50% |
| East Midlands Railway | 92 | 27 | 7 | 119 | 77% | 67% |
| Elizabeth line | 222 | 41 | 3 | 263 | 84% | 72% |
| Grand Central | 2 | 0 | 0 | 2 | 100% | 100% |
| Great Western Railway | 389 | 64 | 17 | 453 | 85% | 81% |
| Greater Anglia | 309 | 18 | 0 | 327 | 94% | 93% |
| Greater Thameslink Railway | 678 | 290 | 133 | 968 | 70% | 63% |
| Heathrow Express | 12 | 11 | 0 | 23 | 52% | 25% |
| Hull Trains | 2 | 0 | 0 | 2 | 100% | 100% |
| London North Eastern Railway | 36 | 2 | 0 | 38 | 94% | 95% |
| London Overground | 388 | 30 | 16 | 418 | 92% | 90% |
| Lumo East Coast | 1 | 1 | 0 | 2 | 50% | 50% |
| Lumo West Coast | 0 | 1 | 0 | 1 | 0% | 0% |
| Merseyrail | 151 | 3 | 2 | 154 | 98% | 96% |
| Northern Trains | 563 | 125 | 35 | 688 | 81% | 77% |
| ScotRail | 524 | 31 | 10 | 555 | 94% | 94% |
| South Western Railway | 382 | 35 | 7 | 417 | 91% | 94% |
| Southeastern | 405 | 109 | 3 | 514 | 78% | 70% |
| TransPennine Trains | 67 | 13 | 6 | 80 | 83% | 67% |
| Transport for Wales | 239 | 23 | 11 | 262 | 91% | 89% |
| West Midlands Trains | 282 | 59 | 22 | 341 | 82% | 76% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 5 | 2 | 0 | 7 | 71% | — |
| DB Cargo | 40 | 4 | 0 | 44 | 90% | 100% |
| Direct Rail Services | 6 | 1 | 0 | 7 | 85% | 100% |
| Freightliner Intermodal | 8 | 3 | 0 | 11 | 72% | 66% |
| GB Railfreight | 21 | 4 | 0 | 25 | 84% | 66% |
| Heavy Haul Rail | 15 | 2 | 0 | 17 | 88% | 100% |
| Network Rail - Materials | 51 | 4 | 0 | 55 | 92% | 100% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By