Realtime National Passenger Train Stats
Wednesday, 4 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 03:37:56
On Time
105
87.5%
Late
15
12.5%
Cancelled / Very Late
4
3.3%
Total
120
National PPM
87%
Rolling: —
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Southeastern
On Time
100.0%
Late
0.0%
Cancelled / Very Late
0.0%
Total Trains
22
PPM: 100%
Worst Performing Operator
Great Western Railway
On Time
68.8%
Late
31.2%
Cancelled / Very Late
6.2%
Total Trains
16
PPM: 68%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 0 | 0 | 0 | 0 | — | — |
| c2c | 2 | 0 | 0 | 2 | 100% | — |
| Caledonian Sleeper Limited | 0 | 0 | 0 | 0 | — | — |
| Chiltern | 3 | 0 | 0 | 3 | 100% | — |
| CrossCountry | 0 | 1 | 1 | 1 | — | — |
| East Midlands Railway | 1 | 0 | 0 | 1 | — | — |
| Elizabeth line | 4 | 0 | 0 | 4 | 100% | — |
| Grand Central | 0 | 0 | 0 | 0 | — | — |
| Great Western Railway | 11 | 5 | 1 | 16 | 68% | — |
| Greater Anglia | 6 | 1 | 0 | 7 | 85% | — |
| Greater Thameslink Railway | 28 | 3 | 0 | 31 | 90% | — |
| Heathrow Express | 0 | 0 | 0 | 0 | — | — |
| Hull Trains | 0 | 0 | 0 | 0 | — | — |
| London North Eastern Railway | 0 | 0 | 0 | 0 | — | — |
| London Overground | 10 | 1 | 0 | 11 | 90% | — |
| Lumo East Coast | 0 | 0 | 0 | 0 | — | — |
| Lumo West Coast | 0 | 0 | 0 | 0 | — | — |
| Merseyrail | 0 | 0 | 0 | 0 | — | — |
| Northern Trains | 1 | 0 | 0 | 1 | — | — |
| ScotRail | 1 | 0 | 0 | 1 | — | — |
| South Western Railway | 6 | 0 | 0 | 6 | 100% | — |
| Southeastern | 22 | 0 | 0 | 22 | 100% | — |
| TransPennine Trains | 6 | 1 | 0 | 7 | 85% | — |
| Transport for Wales | 2 | 0 | 0 | 2 | 100% | — |
| West Midlands Trains | 2 | 3 | 2 | 5 | 40% | — |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 0 | 0 | 0 | 0 | — | — |
| DB Cargo | 5 | 0 | 0 | 5 | 100% | — |
| Direct Rail Services | 0 | 0 | 0 | 0 | — | — |
| Freightliner Intermodal | 0 | 0 | 0 | 0 | — | — |
| GB Railfreight | 0 | 0 | 0 | 0 | — | — |
| Heavy Haul Rail | 4 | 0 | 0 | 4 | 100% | — |
| Network Rail - Materials | 6 | 1 | 0 | 7 | 85% | — |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By