Realtime National Passenger Train Stats

Sunday, 13 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 04:08:56

On Time

119

76.8%

Late

36

23.2%

Cancelled / Very Late

6

3.9%

Total

155

 

National PPM

76%

Rolling: 77%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London Overground

On Time

92.3%

Late

7.7%

Cancelled / Very Late

0.0%

Total Trains

39

PPM: 92%

Worst Performing Operator

Southeastern

On Time

66.7%

Late

33.3%

Cancelled / Very Late

0.0%

Total Trains

24

PPM: 66%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0
c2c 1 1 0 2 50%
Caledonian Sleeper Limited 0 0 0 0
Chiltern 5 0 0 5 100%
CrossCountry 0 4 4 4 0% 0%
East Midlands Railway 0 0 0 0
Elizabeth line 3 2 1 5 60%
Grand Central 0 0 0 0
Great Western Railway 3 1 0 4 75%
Greater Anglia 7 2 0 9 77%
Greater Thameslink Railway 27 12 1 39 69% 40%
Heathrow Express 0 0 0 0
Hull Trains 0 0 0 0
London North Eastern Railway 0 0 0 0
London Overground 36 3 0 39 92% 100%
Lumo East Coast 0 0 0 0
Lumo West Coast 0 0 0 0
Merseyrail 0 0 0 0
Northern Trains 0 0 0 0
ScotRail 0 0 0 0
South Western Railway 17 3 0 20 85% 100%
Southeastern 16 8 0 24 66%
TransPennine Trains 1 0 0 1
Transport for Wales 1 0 0 1
West Midlands Trains 2 0 0 2 100%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 1 0 0 1
DB Cargo 0 0 0 0
Direct Rail Services 0 0 0 0
Freightliner Intermodal 0 0 0 0
GB Railfreight 0 0 0 0
Heavy Haul Rail 0 0 0 0
Network Rail - Materials 12 0 0 12 100% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo