On Time

10717

84.6%

Late

1950

15.4%

Cancelled / Very Late

420

3.3%

Total

12667

 

National PPM

84%

Rolling: 81%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London Overground

On Time

98.2%

Late

1.8%

Cancelled / Very Late

0.8%

Total Trains

887

PPM: 98%

Worst Performing Operator

London North Eastern Railway

On Time

58.0%

Late

42.0%

Cancelled / Very Late

19.0%

Total Trains

100

PPM: 58%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 107 58 8 165 64% 34%
c2c 174 33 11 207 84% 74%
Caledonian Sleeper Limited 3 0 0 3 100% —
Chiltern 160 26 1 186 86% 94%
CrossCountry 90 55 24 145 62% 46%
East Midlands Railway 219 54 7 273 80% 83%
Elizabeth line 574 18 5 592 96% 98%
Grand Central 4 5 3 9 44% 0%
Great Western Railway 727 208 44 935 77% 69%
Greater Anglia 675 51 1 726 92% 93%
Greater Thameslink Railway 1653 253 44 1906 86% 86%
Heathrow Express 80 8 0 88 90% 87%
Hull Trains 3 3 2 6 50% —
London North Eastern Railway 58 42 19 100 58% 25%
London Overground 871 16 7 887 98% 98%
Lumo East Coast 3 3 1 6 50% 0%
Lumo West Coast 3 1 0 4 75% 0%
Merseyrail 340 26 15 366 92% 92%
Northern Trains 1195 345 67 1540 77% 77%
ScotRail 1122 146 24 1268 88% 85%
South Western Railway 670 243 57 913 73% 76%
Southeastern 877 114 24 991 88% 85%
TransPennine Trains 140 30 6 170 82% 70%
Transport for Wales 546 56 24 602 90% 87%
West Midlands Trains 516 176 32 692 74% 62%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 11 3 2 14 78% 66%
DB Cargo 60 10 0 70 85% 92%
Direct Rail Services 10 3 0 13 76% 50%
Freightliner Intermodal 28 2 0 30 93% 100%
GB Railfreight 53 14 1 67 79% 100%
Heavy Haul Rail 49 6 0 55 89% 100%
Network Rail - Materials 70 10 0 80 87% 71%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo