Realtime National Passenger Train Stats

Tuesday, 1 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 05:26:56

On Time

146

62.4%

Late

88

37.6%

Cancelled / Very Late

73

31.2%

Total

234

 

National PPM

62%

Rolling: 47%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

South Western Railway

On Time

91.7%

Late

8.3%

Cancelled / Very Late

8.3%

Total Trains

12

PPM: 91%

Worst Performing Operator

London Overground

On Time

17.0%

Late

83.0%

Cancelled / Very Late

83.0%

Total Trains

53

PPM: 16%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 1 1 1
c2c 2 2 0 4 50%
Caledonian Sleeper Limited 0 0 0 0
Chiltern 3 1 0 4 75%
CrossCountry 1 0 0 1
East Midlands Railway 0 0 0 0
Elizabeth line 7 0 0 7 100% 100%
Grand Central 0 0 0 0
Great Western Railway 18 8 8 26 69% 40%
Greater Anglia 7 0 0 7 100%
Greater Thameslink Railway 48 16 11 64 75% 68%
Heathrow Express 2 0 0 2 100% 100%
Hull Trains 0 0 0 0
London North Eastern Railway 0 0 0 0
London Overground 9 44 44 53 16% 0%
Lumo East Coast 0 0 0 0
Lumo West Coast 0 0 0 0
Merseyrail 0 0 0 0
Northern Trains 1 3 3 4 25% 0%
ScotRail 1 0 0 1
South Western Railway 11 1 1 12 91% 100%
Southeastern 20 6 0 26 76% 100%
TransPennine Trains 9 3 2 12 75% 80%
Transport for Wales 6 1 1 7 85% 80%
West Midlands Trains 3 2 2 5 60%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 2 0 0 2 100%
DB Cargo 8 0 0 8 100% 100%
Direct Rail Services 0 0 0 0
Freightliner Intermodal 0 0 0 0
GB Railfreight 1 1 0 2 50%
Heavy Haul Rail 6 0 0 6 100% 100%
Network Rail - Materials 19 1 0 20 95% 91%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo