Realtime National Passenger Train Stats

Friday, 27 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 01:20:56

On Time

18498

81.1%

Late

4311

18.9%

Cancelled / Very Late

1273

5.6%

Total

22809

 

National PPM

81%

Rolling: 78%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

96.5%

Late

3.5%

Cancelled / Very Late

1.1%

Total Trains

621

PPM: 96%

Worst Performing Operator

Grand Central

On Time

60.0%

Late

40.0%

Cancelled / Very Late

0.0%

Total Trains

20

PPM: 60%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 248 68 9 316 78% 71%
c2c 283 83 54 366 77% 61%
Caledonian Sleeper Limited 4 2 1 6 66% 100%
Chiltern 294 46 6 340 86% 95%
CrossCountry 209 70 22 279 74% 70%
East Midlands Railway 404 100 25 504 80% 96%
Elizabeth line 841 206 63 1047 80% 95%
Grand Central 12 8 0 20 60% —
Great Western Railway 1390 302 95 1692 82% 70%
Greater Anglia 1194 110 19 1304 91% 86%
Greater Thameslink Railway 2665 713 129 3378 78% 79%
Heathrow Express 123 29 14 152 80% 100%
Hull Trains 13 1 0 14 92% —
London North Eastern Railway 174 21 4 195 89% 84%
London Overground 1161 440 346 1601 72% 58%
Lumo East Coast 10 2 0 12 83% 100%
Lumo West Coast 9 1 0 10 90% —
Merseyrail 599 22 7 621 96% 100%
Northern Trains 2092 640 135 2732 76% 75%
ScotRail 1818 458 131 2276 79% 71%
South Western Railway 1363 315 33 1678 81% 81%
Southeastern 1530 263 22 1793 85% 76%
TransPennine Trains 228 82 43 310 73% 84%
Transport for Wales 903 149 60 1052 85% 82%
West Midlands Trains 1098 221 69 1319 83% 91%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 25 15 12 40 62% 100%
DB Cargo 118 18 0 136 86% 90%
Direct Rail Services 31 0 0 31 100% 100%
Freightliner Intermodal 50 8 0 58 86% 77%
GB Railfreight 116 23 2 139 83% 81%
Heavy Haul Rail 78 14 0 92 84% 83%
Network Rail - Materials 101 23 0 124 81% 61%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo