Realtime National Passenger Train Stats
Monday, 9 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 15:43:56
On Time
10111
85.3%
Late
1744
14.7%
Cancelled / Very Late
506
4.3%
Total
11855
National PPM
85%
Rolling: 84%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
96.8%
Late
3.2%
Cancelled / Very Late
2.3%
Total Trains
347
PPM: 96%
Worst Performing Operator
Grand Central
On Time
20.0%
Late
80.0%
Cancelled / Very Late
20.0%
Total Trains
10
PPM: 20%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 120 | 43 | 13 | 163 | 73% | 61% |
| c2c | 115 | 29 | 4 | 144 | 79% | 66% |
| Caledonian Sleeper Limited | 2 | 0 | 0 | 2 | 100% | — |
| Chiltern | 169 | 8 | 0 | 177 | 95% | 93% |
| CrossCountry | 100 | 38 | 19 | 138 | 72% | 66% |
| East Midlands Railway | 213 | 36 | 1 | 249 | 85% | 92% |
| Elizabeth line | 477 | 88 | 43 | 565 | 84% | 90% |
| Grand Central | 2 | 8 | 2 | 10 | 20% | 0% |
| Great Western Railway | 807 | 100 | 8 | 907 | 88% | 86% |
| Greater Anglia | 647 | 40 | 3 | 687 | 94% | 97% |
| Greater Thameslink Railway | 1485 | 324 | 73 | 1809 | 82% | 82% |
| Heathrow Express | 62 | 22 | 2 | 84 | 73% | 43% |
| Hull Trains | 7 | 0 | 0 | 7 | 100% | — |
| London North Eastern Railway | 64 | 33 | 17 | 97 | 65% | 13% |
| London Overground | 718 | 79 | 53 | 797 | 90% | 98% |
| Lumo East Coast | 4 | 1 | 0 | 5 | 80% | 100% |
| Lumo West Coast | 4 | 0 | 0 | 4 | 100% | 100% |
| Merseyrail | 336 | 11 | 8 | 347 | 96% | 94% |
| Northern Trains | 1149 | 284 | 71 | 1433 | 80% | 74% |
| ScotRail | 1068 | 124 | 31 | 1192 | 89% | 85% |
| South Western Railway | 658 | 190 | 60 | 848 | 77% | 79% |
| Southeastern | 786 | 146 | 48 | 932 | 84% | 86% |
| TransPennine Trains | 134 | 17 | 7 | 151 | 88% | 75% |
| Transport for Wales | 478 | 80 | 31 | 558 | 85% | 87% |
| West Midlands Trains | 585 | 74 | 16 | 659 | 88% | 91% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 13 | 2 | 2 | 15 | 86% | 83% |
| DB Cargo | 52 | 2 | 0 | 54 | 96% | 84% |
| Direct Rail Services | 4 | 3 | 0 | 7 | 57% | 33% |
| Freightliner Intermodal | 6 | 0 | 0 | 6 | 100% | — |
| GB Railfreight | 37 | 8 | 2 | 45 | 82% | 85% |
| Heavy Haul Rail | 24 | 9 | 0 | 33 | 72% | 55% |
| Network Rail - Materials | 45 | 9 | 0 | 54 | 83% | 88% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By