Realtime National Passenger Train Stats

Friday, 27 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 06:29:56

On Time

526

86.8%

Late

80

13.2%

Cancelled / Very Late

38

6.3%

Total

606

 

National PPM

86%

Rolling: 89%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

11

PPM: 100%

Worst Performing Operator

c2c

On Time

70.6%

Late

29.4%

Cancelled / Very Late

17.6%

Total Trains

17

PPM: 70%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 2 2 2 0% 0%
c2c 12 5 3 17 70% 84%
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 8 0 0 8 100% 100%
CrossCountry 4 1 1 5 80% 80%
East Midlands Railway 7 0 0 7 100% 100%
Elizabeth line 31 2 1 33 93% 93%
Grand Central 0 0 0 0 — —
Great Western Railway 56 12 3 68 82% 90%
Greater Anglia 40 5 0 45 88% 94%
Greater Thameslink Railway 128 16 7 144 88% 90%
Heathrow Express 11 0 0 11 100% 100%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 35 0 0 35 100% 100%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 5 0 0 5 100% 100%
Northern Trains 25 7 3 32 78% 80%
ScotRail 13 5 2 18 72% 76%
South Western Railway 31 11 10 42 73% 69%
Southeastern 70 6 1 76 92% 98%
TransPennine Trains 14 0 0 14 100% 100%
Transport for Wales 27 5 3 32 84% 86%
West Midlands Trains 20 3 2 23 86% 89%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 2 1 1 3 66% 66%
DB Cargo 14 0 0 14 100% 100%
Direct Rail Services 1 0 0 1 — —
Freightliner Intermodal 3 0 0 3 100% 100%
GB Railfreight 4 1 0 5 80% 75%
Heavy Haul Rail 14 2 0 16 87% 91%
Network Rail - Materials 43 2 0 45 95% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo