Realtime National Passenger Train Stats
Sunday, 22 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 21:16:56
On Time
9449
88.1%
Late
1275
11.9%
Cancelled / Very Late
415
3.9%
Total
10724
National PPM
88%
Rolling: 84%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
London Overground
On Time
96.6%
Late
3.4%
Cancelled / Very Late
1.8%
Total Trains
925
PPM: 96%
Worst Performing Operator
CrossCountry
On Time
71.5%
Late
28.5%
Cancelled / Very Late
17.9%
Total Trains
123
PPM: 71%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 149 | 32 | 8 | 181 | 82% | 85% |
| c2c | 139 | 7 | 5 | 146 | 95% | 100% |
| Caledonian Sleeper Limited | 0 | 0 | 0 | 0 | — | — |
| Chiltern | 147 | 11 | 1 | 158 | 93% | 92% |
| CrossCountry | 88 | 35 | 22 | 123 | 71% | 80% |
| East Midlands Railway | 178 | 50 | 13 | 228 | 78% | 79% |
| Elizabeth line | 559 | 84 | 36 | 643 | 86% | 77% |
| Grand Central | 12 | 4 | 1 | 16 | 75% | 33% |
| Great Western Railway | 651 | 129 | 30 | 780 | 83% | 68% |
| Greater Anglia | 673 | 37 | 14 | 710 | 94% | 83% |
| Greater Thameslink Railway | 1327 | 210 | 83 | 1537 | 86% | 87% |
| Heathrow Express | 103 | 26 | 2 | 129 | 79% | 87% |
| Hull Trains | 8 | 1 | 0 | 9 | 88% | — |
| London North Eastern Railway | 109 | 21 | 5 | 130 | 83% | 75% |
| London Overground | 894 | 31 | 17 | 925 | 96% | 95% |
| Lumo East Coast | 6 | 1 | 1 | 7 | 85% | 100% |
| Lumo West Coast | 5 | 0 | 0 | 5 | 100% | 100% |
| Merseyrail | 245 | 11 | 4 | 256 | 95% | 82% |
| Northern Trains | 999 | 149 | 46 | 1148 | 87% | 85% |
| ScotRail | 866 | 75 | 10 | 941 | 92% | 89% |
| South Western Railway | 731 | 129 | 49 | 860 | 85% | 79% |
| Southeastern | 645 | 71 | 13 | 716 | 90% | 89% |
| TransPennine Trains | 166 | 18 | 6 | 184 | 90% | 87% |
| Transport for Wales | 493 | 64 | 11 | 557 | 88% | 90% |
| West Midlands Trains | 390 | 111 | 42 | 501 | 77% | 74% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 6 | 1 | 0 | 7 | 85% | — |
| DB Cargo | 12 | 5 | 0 | 17 | 70% | 33% |
| Direct Rail Services | 4 | 0 | 0 | 4 | 100% | — |
| Freightliner Intermodal | 1 | 0 | 0 | 1 | — | — |
| GB Railfreight | 12 | 2 | 0 | 14 | 85% | 80% |
| Heavy Haul Rail | 1 | 0 | 0 | 1 | — | — |
| Network Rail - Materials | 71 | 5 | 0 | 76 | 93% | 100% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By