Realtime National Passenger Train Stats

Friday, 20 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 20:35:56

On Time

14979

81.1%

Late

3481

18.9%

Cancelled / Very Late

1049

5.7%

Total

18460

 

National PPM

81%

Rolling: 72%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Chiltern

On Time

97.8%

Late

2.2%

Cancelled / Very Late

0.7%

Total Trains

277

PPM: 97%

Worst Performing Operator

CrossCountry

On Time

50.7%

Late

49.3%

Cancelled / Very Late

34.4%

Total Trains

227

PPM: 50%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 147 104 22 251 58% 56%
c2c 265 40 23 305 86% 92%
Caledonian Sleeper Limited 1 2 2 3 33% —
Chiltern 271 6 2 277 97% 97%
CrossCountry 115 112 78 227 50% 25%
East Midlands Railway 327 74 17 401 81% 61%
Elizabeth line 769 95 21 864 89% 89%
Grand Central 9 8 1 17 52% 75%
Great Western Railway 1100 285 93 1385 79% 83%
Greater Anglia 990 58 15 1048 94% 90%
Greater Thameslink Railway 2233 538 178 2771 80% 75%
Heathrow Express 101 23 3 124 81% 100%
Hull Trains 10 1 0 11 90% 50%
London North Eastern Railway 91 61 23 152 59% 58%
London Overground 1164 118 46 1282 90% 76%
Lumo East Coast 2 6 4 8 25% 0%
Lumo West Coast 4 3 0 7 57% 100%
Merseyrail 501 23 6 524 95% 93%
Northern Trains 1683 510 99 2193 76% 68%
ScotRail 1427 420 139 1847 77% 55%
South Western Railway 965 371 128 1336 72% 74%
Southeastern 1233 227 23 1460 84% 69%
TransPennine Trains 180 61 9 241 74% 76%
Transport for Wales 687 167 86 854 80% 66%
West Midlands Trains 830 209 39 1039 79% 64%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 13 0 0 13 100% 100%
DB Cargo 79 11 0 90 87% 90%
Direct Rail Services 11 5 0 16 68% —
Freightliner Intermodal 31 8 0 39 79% 71%
GB Railfreight 71 11 1 82 86% 100%
Heavy Haul Rail 51 6 0 57 89% 66%
Network Rail - Materials 81 10 0 91 89% 83%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo