Realtime National Passenger Train Stats

Sunday, 4 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 02:26:56

On Time

105

78.4%

Late

29

21.6%

Cancelled / Very Late

6

4.5%

Total

134

 

National PPM

78%

Rolling: —

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London Overground

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

22

PPM: 100%

Worst Performing Operator

Southeastern

On Time

65.4%

Late

34.6%

Cancelled / Very Late

3.8%

Total Trains

26

PPM: 65%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0 — —
c2c 3 1 0 4 75% —
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 0 1 0 1 — —
CrossCountry 0 0 0 0 — —
East Midlands Railway 0 0 0 0 — —
Elizabeth line 4 0 0 4 100% —
Grand Central 0 0 0 0 — —
Great Western Railway 2 2 0 4 50% —
Greater Anglia 7 0 0 7 100% —
Greater Thameslink Railway 23 9 4 32 71% —
Heathrow Express 0 0 0 0 — —
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 22 0 0 22 100% —
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 0 0 0 0 — —
Northern Trains 0 0 0 0 — —
ScotRail 0 0 0 0 — —
South Western Railway 23 7 1 30 76% —
Southeastern 17 9 1 26 65% —
TransPennine Trains 1 0 0 1 — —
Transport for Wales 1 0 0 1 — —
West Midlands Trains 2 0 0 2 100% —

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 0 0 0 0 — —
DB Cargo 0 0 0 0 — —
Direct Rail Services 0 0 0 0 — —
Freightliner Intermodal 0 0 0 0 — —
GB Railfreight 0 0 0 0 — —
Heavy Haul Rail 0 0 0 0 — —
Network Rail - Materials 12 1 0 13 92% —

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo