On Time
16912
82.5%
Late
3582
17.5%
Cancelled / Very Late
861
4.2%
Total
20494
National PPM
82%
Rolling: 80%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
97.2%
Late
2.8%
Cancelled / Very Late
1.8%
Total Trains
567
PPM: 97%
Worst Performing Operator
Grand Central
On Time
50.0%
Late
50.0%
Cancelled / Very Late
11.1%
Total Trains
18
PPM: 50%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 192 | 94 | 30 | 286 | 67% | 53% |
| c2c | 232 | 98 | 6 | 330 | 70% | 70% |
| Caledonian Sleeper Limited | 3 | 0 | 0 | 3 | 100% | — |
| Chiltern | 283 | 37 | 4 | 320 | 88% | 93% |
| CrossCountry | 148 | 94 | 37 | 242 | 61% | 45% |
| East Midlands Railway | 313 | 130 | 32 | 443 | 70% | 65% |
| Elizabeth line | 923 | 41 | 3 | 964 | 95% | 99% |
| Grand Central | 9 | 9 | 2 | 18 | 50% | — |
| Great Western Railway | 1331 | 209 | 62 | 1540 | 86% | 87% |
| Greater Anglia | 1106 | 73 | 6 | 1179 | 93% | 94% |
| Greater Thameslink Railway | 2278 | 765 | 203 | 3043 | 74% | 70% |
| Heathrow Express | 133 | 5 | 0 | 138 | 96% | 100% |
| Hull Trains | 7 | 6 | 3 | 13 | 53% | 0% |
| London North Eastern Railway | 122 | 51 | 19 | 173 | 70% | 33% |
| London Overground | 1365 | 79 | 39 | 1444 | 94% | 89% |
| Lumo East Coast | 7 | 3 | 2 | 10 | 70% | 100% |
| Lumo West Coast | 6 | 2 | 0 | 8 | 75% | 100% |
| Merseyrail | 551 | 16 | 10 | 567 | 97% | 93% |
| Northern Trains | 1990 | 510 | 100 | 2500 | 79% | 77% |
| ScotRail | 1712 | 273 | 40 | 1985 | 86% | 88% |
| South Western Railway | 1215 | 278 | 75 | 1493 | 81% | 88% |
| Southeastern | 1182 | 438 | 93 | 1620 | 72% | 70% |
| TransPennine Trains | 228 | 49 | 13 | 277 | 82% | 59% |
| Transport for Wales | 862 | 99 | 40 | 961 | 89% | 85% |
| West Midlands Trains | 876 | 248 | 49 | 1124 | 77% | 80% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 24 | 1 | 0 | 25 | 96% | — |
| DB Cargo | 89 | 8 | 0 | 97 | 91% | 88% |
| Direct Rail Services | 21 | 5 | 0 | 26 | 80% | 60% |
| Freightliner Intermodal | 41 | 8 | 0 | 49 | 83% | 80% |
| GB Railfreight | 75 | 24 | 0 | 99 | 75% | 76% |
| Heavy Haul Rail | 57 | 10 | 0 | 67 | 85% | 100% |
| Network Rail - Materials | 96 | 20 | 0 | 116 | 82% | 85% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.