Realtime National Passenger Train Stats

Sunday, 22 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 20:40:56

On Time

9033

88.3%

Late

1200

11.7%

Cancelled / Very Late

390

3.8%

Total

10233

 

National PPM

88%

Rolling: 85%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Greater Anglia

On Time

96.2%

Late

3.8%

Cancelled / Very Late

0.4%

Total Trains

678

PPM: 96%

Worst Performing Operator

CrossCountry

On Time

70.1%

Late

29.9%

Cancelled / Very Late

18.8%

Total Trains

117

PPM: 70%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 137 29 8 166 82% 88%
c2c 135 7 5 142 95% 95%
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 139 10 1 149 93% 92%
CrossCountry 82 35 22 117 70% 74%
East Midlands Railway 166 46 13 212 78% 81%
Elizabeth line 530 82 35 612 86% 69%
Grand Central 12 2 1 14 85% 50%
Great Western Railway 631 118 26 749 84% 73%
Greater Anglia 652 26 3 678 96% 94%
Greater Thameslink Railway 1267 203 79 1470 86% 85%
Heathrow Express 97 26 2 123 78% 64%
Hull Trains 8 1 0 9 88% 100%
London North Eastern Railway 103 17 5 120 85% 85%
London Overground 857 30 16 887 96% 96%
Lumo East Coast 5 1 1 6 83% 100%
Lumo West Coast 5 0 0 5 100% 100%
Merseyrail 235 11 4 246 95% 82%
Northern Trains 950 145 46 1095 86% 84%
ScotRail 827 69 10 896 92% 88%
South Western Railway 702 121 47 823 85% 81%
Southeastern 617 68 13 685 90% 89%
TransPennine Trains 154 16 6 170 90% 92%
Transport for Wales 470 60 11 530 88% 91%
West Midlands Trains 379 107 40 486 77% 74%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 6 1 0 7 85% —
DB Cargo 13 3 0 16 81% 100%
Direct Rail Services 4 0 0 4 100% —
Freightliner Intermodal 1 0 0 1 — —
GB Railfreight 10 2 0 12 83% 66%
Heavy Haul Rail 1 0 0 1 — —
Network Rail - Materials 69 5 0 74 93% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo