Realtime National Passenger Train Stats
Thursday, 24 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 22:13:56
On Time
17410
85.5%
Late
2944
14.5%
Cancelled / Very Late
779
3.8%
Total
20354
National PPM
85%
Rolling: 77%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
97.5%
Late
2.5%
Cancelled / Very Late
1.6%
Total Trains
565
PPM: 97%
Worst Performing Operator
CrossCountry
On Time
70.8%
Late
29.2%
Cancelled / Very Late
11.1%
Total Trains
243
PPM: 70%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 255 | 24 | 2 | 279 | 91% | 85% |
| c2c | 275 | 52 | 2 | 327 | 84% | 78% |
| Caledonian Sleeper Limited | 3 | 1 | 1 | 4 | 75% | — |
| Chiltern | 274 | 40 | 3 | 314 | 87% | 93% |
| CrossCountry | 172 | 71 | 27 | 243 | 70% | 78% |
| East Midlands Railway | 374 | 64 | 12 | 438 | 85% | 77% |
| Elizabeth line | 886 | 49 | 18 | 935 | 94% | 70% |
| Grand Central | 16 | 2 | 0 | 18 | 88% | 50% |
| Great Western Railway | 1276 | 263 | 49 | 1539 | 82% | 85% |
| Greater Anglia | 1032 | 121 | 31 | 1153 | 89% | 71% |
| Greater Thameslink Railway | 2439 | 584 | 177 | 3023 | 80% | 77% |
| Heathrow Express | 116 | 20 | 0 | 136 | 85% | 76% |
| Hull Trains | 10 | 3 | 1 | 13 | 76% | 100% |
| London North Eastern Railway | 160 | 12 | 1 | 172 | 93% | 92% |
| London Overground | 1285 | 133 | 64 | 1418 | 90% | 79% |
| Lumo East Coast | 9 | 1 | 0 | 10 | 90% | 100% |
| Lumo West Coast | 6 | 1 | 0 | 7 | 85% | — |
| Merseyrail | 551 | 14 | 9 | 565 | 97% | 100% |
| Northern Trains | 2054 | 451 | 130 | 2505 | 81% | 77% |
| ScotRail | 1840 | 193 | 32 | 2033 | 90% | 89% |
| South Western Railway | 1208 | 270 | 79 | 1478 | 81% | 63% |
| Southeastern | 1323 | 289 | 46 | 1612 | 82% | 61% |
| TransPennine Trains | 268 | 39 | 16 | 307 | 87% | 81% |
| Transport for Wales | 802 | 119 | 46 | 921 | 87% | 81% |
| West Midlands Trains | 933 | 155 | 34 | 1088 | 85% | 78% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 17 | 6 | 4 | 23 | 73% | — |
| DB Cargo | 73 | 10 | 0 | 83 | 87% | 88% |
| Direct Rail Services | 24 | 1 | 0 | 25 | 96% | 100% |
| Freightliner Intermodal | 44 | 6 | 0 | 50 | 88% | 100% |
| GB Railfreight | 81 | 15 | 0 | 96 | 84% | 69% |
| Heavy Haul Rail | 68 | 7 | 0 | 75 | 90% | 70% |
| Network Rail - Materials | 91 | 7 | 0 | 98 | 92% | 80% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By