Realtime National Passenger Train Stats

Saturday, 29 August 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 05:29:57

On Time

222

79.6%

Late

57

20.4%

Cancelled / Very Late

36

12.9%

Total

279

 

National PPM

79%

Rolling: 82%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London Overground

On Time

98.0%

Late

2.0%

Cancelled / Very Late

0.0%

Total Trains

49

PPM: 97%

Worst Performing Operator

Northern Trains

On Time

5.9%

Late

94.1%

Cancelled / Very Late

94.1%

Total Trains

17

PPM: 5%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0
c2c 8 2 1 10 80% 100%
Caledonian Sleeper Limited 0 0 0 0
Chiltern 3 2 2 5 60%
CrossCountry 1 0 0 1
East Midlands Railway 0 0 0 0
Elizabeth line 7 0 0 7 100% 100%
Grand Central 0 0 0 0
Great Western Railway 19 5 2 24 79% 80%
Greater Anglia 23 4 0 27 85% 88%
Greater Thameslink Railway 42 16 9 58 72% 86%
Heathrow Express 1 2 2 3 33% 33%
Hull Trains 0 0 0 0
London North Eastern Railway 0 0 0 0
London Overground 48 1 0 49 97% 100%
Lumo East Coast 0 0 0 0
Lumo West Coast 0 0 0 0
Merseyrail 0 0 0 0
Northern Trains 1 16 16 17 5% 0%
ScotRail 5 2 0 7 71%
South Western Railway 21 2 1 23 91% 100%
Southeastern 19 3 1 22 86%
TransPennine Trains 10 2 2 12 83% 100%
Transport for Wales 10 1 1 11 90% 80%
West Midlands Trains 5 1 1 6 83% 100%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 2 0 0 2 100%
DB Cargo 9 1 0 10 90% 100%
Direct Rail Services 1 0 0 1
Freightliner Intermodal 3 0 0 3 100% 100%
GB Railfreight 2 0 0 2 100%
Heavy Haul Rail 1 0 0 1
Network Rail - Materials 5 0 0 5 100% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo