Realtime National Passenger Train Stats

Tuesday, 27 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 11:20:56

On Time

4809

73.7%

Late

1716

26.3%

Cancelled / Very Late

656

10.1%

Total

6525

 

National PPM

73%

Rolling: 72%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

98.9%

Late

1.1%

Cancelled / Very Late

0.0%

Total Trains

177

PPM: 98%

Worst Performing Operator

c2c

On Time

32.5%

Late

67.5%

Cancelled / Very Late

10.8%

Total Trains

83

PPM: 32%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 43 29 8 72 59% 55%
c2c 27 56 9 83 32% 25%
Caledonian Sleeper Limited 1 1 1 2 50% —
Chiltern 90 19 0 109 82% 75%
CrossCountry 46 19 7 65 70% 65%
East Midlands Railway 120 14 2 134 89% 88%
Elizabeth line 131 192 144 323 40% 45%
Grand Central 2 0 0 2 100% 100%
Great Western Railway 329 160 94 489 67% 68%
Greater Anglia 347 43 2 390 88% 88%
Greater Thameslink Railway 811 213 28 1024 79% 82%
Heathrow Express 26 24 20 50 52% 93%
Hull Trains 0 2 0 2 0% —
London North Eastern Railway 34 8 3 42 80% 79%
London Overground 421 37 19 458 91% 89%
Lumo East Coast 2 0 0 2 100% 100%
Lumo West Coast 1 0 0 1 100% 100%
Merseyrail 175 2 0 177 98% 98%
Northern Trains 587 161 45 748 78% 82%
ScotRail 369 245 78 614 60% 50%
South Western Railway 261 199 89 460 56% 51%
Southeastern 489 106 17 595 82% 80%
TransPennine Trains 72 36 19 108 66% 74%
Transport for Wales 157 101 72 258 60% 53%
West Midlands Trains 299 75 19 374 79% 80%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 5 1 0 6 83% 100%
DB Cargo 21 2 0 23 91% 100%
Direct Rail Services 6 2 0 8 75% 66%
Freightliner Intermodal 9 0 0 9 100% 100%
GB Railfreight 21 6 1 27 77% 85%
Heavy Haul Rail 20 2 0 22 90% 80%
Network Rail - Materials 46 7 0 53 86% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo