Last updated: 08:37:56

On Time

510

84.0%

Late

97

16.0%

Cancelled / Very Late

39

6.4%

Total

607

 

National PPM

84%

Rolling: 85%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

11

PPM: 100%

Worst Performing Operator

Greater Thameslink Railway

On Time

76.3%

Late

23.7%

Cancelled / Very Late

7.1%

Total Trains

156

PPM: 76%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0 — —
c2c 14 1 0 15 93% 90%
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 4 0 0 4 100% 100%
CrossCountry 0 4 4 4 0% 0%
East Midlands Railway 2 2 2 4 50% 50%
Elizabeth line 50 2 0 52 96% 95%
Grand Central 0 0 0 0 — —
Great Western Railway 13 2 1 15 86% 87%
Greater Anglia 53 5 1 58 91% 97%
Greater Thameslink Railway 119 37 11 156 76% 81%
Heathrow Express 25 2 1 27 92% 93%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 91 11 8 102 89% 84%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 11 0 0 11 100% 100%
Northern Trains 4 1 0 5 80% 80%
ScotRail 3 0 0 3 100% 100%
South Western Railway 80 21 6 101 79% 77%
Southeastern 64 6 1 70 91% 95%
TransPennine Trains 0 1 1 1 — —
Transport for Wales 1 0 0 1 — —
West Midlands Trains 1 4 4 5 20% 0%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 2 1 0 3 66% —
DB Cargo 0 0 0 0 — —
Direct Rail Services 0 0 0 0 — —
Freightliner Intermodal 0 0 0 0 — —
GB Railfreight 0 0 0 0 — —
Heavy Haul Rail 0 0 0 0 — —
Network Rail - Materials 30 4 0 34 88% 91%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo