Realtime National Passenger Train Stats
Friday, 20 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 20:35:56
On Time
14979
81.1%
Late
3481
18.9%
Cancelled / Very Late
1049
5.7%
Total
18460
National PPM
81%
Rolling: 72%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Chiltern
On Time
97.8%
Late
2.2%
Cancelled / Very Late
0.7%
Total Trains
277
PPM: 97%
Worst Performing Operator
CrossCountry
On Time
50.7%
Late
49.3%
Cancelled / Very Late
34.4%
Total Trains
227
PPM: 50%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 147 | 104 | 22 | 251 | 58% | 56% |
| c2c | 265 | 40 | 23 | 305 | 86% | 92% |
| Caledonian Sleeper Limited | 1 | 2 | 2 | 3 | 33% | — |
| Chiltern | 271 | 6 | 2 | 277 | 97% | 97% |
| CrossCountry | 115 | 112 | 78 | 227 | 50% | 25% |
| East Midlands Railway | 327 | 74 | 17 | 401 | 81% | 61% |
| Elizabeth line | 769 | 95 | 21 | 864 | 89% | 89% |
| Grand Central | 9 | 8 | 1 | 17 | 52% | 75% |
| Great Western Railway | 1100 | 285 | 93 | 1385 | 79% | 83% |
| Greater Anglia | 990 | 58 | 15 | 1048 | 94% | 90% |
| Greater Thameslink Railway | 2233 | 538 | 178 | 2771 | 80% | 75% |
| Heathrow Express | 101 | 23 | 3 | 124 | 81% | 100% |
| Hull Trains | 10 | 1 | 0 | 11 | 90% | 50% |
| London North Eastern Railway | 91 | 61 | 23 | 152 | 59% | 58% |
| London Overground | 1164 | 118 | 46 | 1282 | 90% | 76% |
| Lumo East Coast | 2 | 6 | 4 | 8 | 25% | 0% |
| Lumo West Coast | 4 | 3 | 0 | 7 | 57% | 100% |
| Merseyrail | 501 | 23 | 6 | 524 | 95% | 93% |
| Northern Trains | 1683 | 510 | 99 | 2193 | 76% | 68% |
| ScotRail | 1427 | 420 | 139 | 1847 | 77% | 55% |
| South Western Railway | 965 | 371 | 128 | 1336 | 72% | 74% |
| Southeastern | 1233 | 227 | 23 | 1460 | 84% | 69% |
| TransPennine Trains | 180 | 61 | 9 | 241 | 74% | 76% |
| Transport for Wales | 687 | 167 | 86 | 854 | 80% | 66% |
| West Midlands Trains | 830 | 209 | 39 | 1039 | 79% | 64% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 13 | 0 | 0 | 13 | 100% | 100% |
| DB Cargo | 79 | 11 | 0 | 90 | 87% | 90% |
| Direct Rail Services | 11 | 5 | 0 | 16 | 68% | — |
| Freightliner Intermodal | 31 | 8 | 0 | 39 | 79% | 71% |
| GB Railfreight | 71 | 11 | 1 | 82 | 86% | 100% |
| Heavy Haul Rail | 51 | 6 | 0 | 57 | 89% | 66% |
| Network Rail - Materials | 81 | 10 | 0 | 91 | 89% | 83% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By