Realtime National Passenger Train Stats

Tuesday, 8 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 10:25:56

On Time

4612

83.2%

Late

929

16.8%

Cancelled / Very Late

232

4.2%

Total

5541

 

National PPM

83%

Rolling: 79%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

TransPennine Trains

On Time

98.7%

Late

1.3%

Cancelled / Very Late

0.0%

Total Trains

75

PPM: 98%

Worst Performing Operator

Heathrow Express

On Time

39.1%

Late

60.9%

Cancelled / Very Late

4.3%

Total Trains

23

PPM: 39%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 39 18 10 57 68% 80%
c2c 46 36 4 82 56% 40%
Caledonian Sleeper Limited 2 0 0 2 100%
Chiltern 61 33 7 94 64% 56%
CrossCountry 44 7 2 51 86% 82%
East Midlands Railway 103 9 0 112 91% 92%
Elizabeth line 182 48 17 230 79% 68%
Grand Central 2 0 0 2 100% 100%
Great Western Railway 371 63 27 434 85% 84%
Greater Anglia 285 27 0 312 91% 88%
Greater Thameslink Railway 684 212 50 896 76% 69%
Heathrow Express 9 14 1 23 39% 20%
Hull Trains 1 1 0 2 50% 50%
London North Eastern Railway 32 1 1 33 96% 100%
London Overground 346 47 18 393 88% 80%
Lumo East Coast 2 0 0 2 100% 100%
Lumo West Coast 1 0 0 1 100% 100%
Merseyrail 134 10 5 144 93% 98%
Northern Trains 578 89 24 667 86% 87%
ScotRail 462 50 16 512 90% 86%
South Western Railway 346 50 11 396 87% 88%
Southeastern 359 130 8 489 73% 64%
TransPennine Trains 74 1 0 75 98% 96%
Transport for Wales 206 39 20 245 84% 79%
West Midlands Trains 258 59 12 317 81% 78%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 2 1 0 3 66%
DB Cargo 29 6 0 35 82% 71%
Direct Rail Services 8 0 0 8 100% 100%
Freightliner Intermodal 11 1 0 12 91% 80%
GB Railfreight 25 1 0 26 96% 83%
Heavy Haul Rail 24 2 0 26 92% 100%
Network Rail - Materials 53 3 0 56 94% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo