Realtime National Passenger Train Stats

Thursday, 24 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 22:13:56

On Time

17410

85.5%

Late

2944

14.5%

Cancelled / Very Late

779

3.8%

Total

20354

 

National PPM

85%

Rolling: 77%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

97.5%

Late

2.5%

Cancelled / Very Late

1.6%

Total Trains

565

PPM: 97%

Worst Performing Operator

CrossCountry

On Time

70.8%

Late

29.2%

Cancelled / Very Late

11.1%

Total Trains

243

PPM: 70%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 255 24 2 279 91% 85%
c2c 275 52 2 327 84% 78%
Caledonian Sleeper Limited 3 1 1 4 75% —
Chiltern 274 40 3 314 87% 93%
CrossCountry 172 71 27 243 70% 78%
East Midlands Railway 374 64 12 438 85% 77%
Elizabeth line 886 49 18 935 94% 70%
Grand Central 16 2 0 18 88% 50%
Great Western Railway 1276 263 49 1539 82% 85%
Greater Anglia 1032 121 31 1153 89% 71%
Greater Thameslink Railway 2439 584 177 3023 80% 77%
Heathrow Express 116 20 0 136 85% 76%
Hull Trains 10 3 1 13 76% 100%
London North Eastern Railway 160 12 1 172 93% 92%
London Overground 1285 133 64 1418 90% 79%
Lumo East Coast 9 1 0 10 90% 100%
Lumo West Coast 6 1 0 7 85% —
Merseyrail 551 14 9 565 97% 100%
Northern Trains 2054 451 130 2505 81% 77%
ScotRail 1840 193 32 2033 90% 89%
South Western Railway 1208 270 79 1478 81% 63%
Southeastern 1323 289 46 1612 82% 61%
TransPennine Trains 268 39 16 307 87% 81%
Transport for Wales 802 119 46 921 87% 81%
West Midlands Trains 933 155 34 1088 85% 78%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 17 6 4 23 73% —
DB Cargo 73 10 0 83 87% 88%
Direct Rail Services 24 1 0 25 96% 100%
Freightliner Intermodal 44 6 0 50 88% 100%
GB Railfreight 81 15 0 96 84% 69%
Heavy Haul Rail 68 7 0 75 90% 70%
Network Rail - Materials 91 7 0 98 92% 80%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo