Realtime National Passenger Train Stats

Friday, 28 August 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 05:26:56

On Time

149

75.6%

Late

48

24.4%

Cancelled / Very Late

24

12.2%

Total

197

 

National PPM

75%

Rolling: 67%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Southeastern

On Time

85.2%

Late

14.8%

Cancelled / Very Late

7.4%

Total Trains

27

PPM: 85%

Worst Performing Operator

Great Western Railway

On Time

63.2%

Late

36.8%

Cancelled / Very Late

21.1%

Total Trains

19

PPM: 63%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0
c2c 9 2 0 11 81% 100%
Caledonian Sleeper Limited 0 1 1 1
Chiltern 4 0 0 4 100%
CrossCountry 1 0 0 1
East Midlands Railway 0 0 0 0
Elizabeth line 8 1 1 9 88% 100%
Grand Central 0 0 0 0
Great Western Railway 12 7 4 19 63% 50%
Greater Anglia 9 2 0 11 81% 100%
Greater Thameslink Railway 42 19 8 61 68% 57%
Heathrow Express 2 0 0 2 100% 100%
Hull Trains 0 0 0 0
London North Eastern Railway 0 0 0 0
London Overground 10 2 2 12 83% 0%
Lumo East Coast 0 0 0 0
Lumo West Coast 0 0 0 0
Merseyrail 0 0 0 0
Northern Trains 1 2 2 3 33% 0%
ScotRail 3 0 0 3 100%
South Western Railway 7 1 0 8 87% 100%
Southeastern 23 4 2 27 85% 66%
TransPennine Trains 12 3 3 15 80% 66%
Transport for Wales 6 1 0 7 85% 100%
West Midlands Trains 2 3 1 5 40%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 1 0 0 1
DB Cargo 4 0 0 4 100% 100%
Direct Rail Services 1 0 0 1
Freightliner Intermodal 2 0 0 2 100% 100%
GB Railfreight 3 0 0 3 100% 100%
Heavy Haul Rail 4 1 0 5 80% 100%
Network Rail - Materials 16 1 0 17 94% 90%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo