Realtime National Passenger Train Stats

Monday, 23 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 13:44:56

On Time

8073

83.9%

Late

1554

16.1%

Cancelled / Very Late

431

4.5%

Total

9627

 

National PPM

83%

Rolling: 85%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

97.8%

Late

2.2%

Cancelled / Very Late

0.9%

Total Trains

465

PPM: 97%

Worst Performing Operator

Avanti West Coast

On Time

71.4%

Late

28.6%

Cancelled / Very Late

2.5%

Total Trains

119

PPM: 71%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 85 34 3 119 71% 63%
c2c 122 43 13 165 73% 96%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 107 33 8 140 76% 91%
CrossCountry 88 18 4 106 83% 91%
East Midlands Railway 167 35 12 202 82% 84%
Elizabeth line 455 10 4 465 97% 100%
Grand Central 2 3 0 5 40% 33%
Great Western Railway 644 78 30 722 89% 88%
Greater Anglia 539 24 3 563 95% 95%
Greater Thameslink Railway 1090 370 123 1460 74% 81%
Heathrow Express 65 4 0 69 94% 93%
Hull Trains 3 3 0 6 50% 66%
London North Eastern Railway 55 22 5 77 71% 51%
London Overground 626 41 26 667 93% 89%
Lumo East Coast 3 1 0 4 75% 100%
Lumo West Coast 3 0 0 3 100% 100%
Merseyrail 260 9 1 269 96% 98%
Northern Trains 932 211 60 1143 81% 81%
ScotRail 748 190 55 938 79% 86%
South Western Railway 506 191 41 697 72% 69%
Southeastern 682 86 4 768 88% 85%
TransPennine Trains 106 16 3 122 86% 83%
Transport for Wales 408 44 20 452 90% 94%
West Midlands Trains 451 99 16 550 82% 81%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 8 2 1 10 80% 75%
DB Cargo 52 8 0 60 86% 90%
Direct Rail Services 8 1 0 9 88% 100%
Freightliner Intermodal 8 2 0 10 80% 50%
GB Railfreight 32 11 1 43 74% 53%
Heavy Haul Rail 17 5 0 22 77% 60%
Network Rail - Materials 38 6 0 44 86% 66%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo