Realtime National Passenger Train Stats

Friday, 25 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 10:15:57

On Time

4797

88.3%

Late

634

11.7%

Cancelled / Very Late

152

2.8%

Total

5431

 

National PPM

88%

Rolling: 85%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London Overground

On Time

97.6%

Late

2.4%

Cancelled / Very Late

0.8%

Total Trains

381

PPM: 97%

Worst Performing Operator

London North Eastern Railway

On Time

65.5%

Late

34.5%

Cancelled / Very Late

0.0%

Total Trains

29

PPM: 65%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 41 8 0 49 83% 80%
c2c 86 24 2 110 78% 66%
Caledonian Sleeper Limited 2 1 1 3 66% —
Chiltern 85 5 1 90 94% 89%
CrossCountry 43 5 0 48 89% 82%
East Midlands Railway 100 5 1 105 95% 94%
Elizabeth line 255 21 10 276 92% 90%
Grand Central 0 1 1 1 — —
Great Western Railway 344 61 13 405 84% 81%
Greater Anglia 276 42 1 318 86% 84%
Greater Thameslink Railway 738 177 50 915 80% 75%
Heathrow Express 29 12 0 41 70% 55%
Hull Trains 2 0 0 2 100% 100%
London North Eastern Railway 19 10 0 29 65% 71%
London Overground 372 9 3 381 97% 97%
Lumo East Coast 2 0 0 2 100% 100%
Lumo West Coast 0 1 0 1 0% 0%
Merseyrail 125 14 7 139 89% 94%
Northern Trains 551 93 31 644 85% 84%
ScotRail 465 17 4 482 96% 95%
South Western Railway 353 33 8 386 91% 89%
Southeastern 426 51 2 477 89% 83%
TransPennine Trains 79 7 3 86 91% 89%
Transport for Wales 216 15 7 231 93% 90%
West Midlands Trains 221 36 8 257 85% 87%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 6 0 0 6 100% —
DB Cargo 20 1 0 21 95% 85%
Direct Rail Services 8 0 0 8 100% —
Freightliner Intermodal 11 2 0 13 84% 100%
GB Railfreight 25 3 0 28 89% 91%
Heavy Haul Rail 20 5 0 25 80% 85%
Network Rail - Materials 52 3 0 55 94% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo