Realtime National Passenger Train Stats

Sunday, 25 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 07:29:57

On Time

116

58.3%

Late

83

41.7%

Cancelled / Very Late

46

23.1%

Total

199

 

National PPM

58%

Rolling: 40%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

13

PPM: 100%

Worst Performing Operator

Great Western Railway

On Time

27.3%

Late

72.7%

Cancelled / Very Late

63.6%

Total Trains

11

PPM: 27%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 4 4 4 0% 0%
c2c 4 0 0 4 100% —
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 0 1 0 1 — —
CrossCountry 0 1 1 1 — —
East Midlands Railway 0 0 0 0 — —
Elizabeth line 13 0 0 13 100% 100%
Grand Central 0 0 0 0 — —
Great Western Railway 3 8 7 11 27% 25%
Greater Anglia 7 1 1 8 87% —
Greater Thameslink Railway 15 23 10 38 39% -34%
Heathrow Express 13 1 0 14 92% 92%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 30 9 6 39 76% 0%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 0 0 0 0 — —
Northern Trains 0 1 1 1 — —
ScotRail 0 0 0 0 — —
South Western Railway 22 15 7 37 59% 60%
Southeastern 21 11 2 32 65% —
TransPennine Trains 0 7 7 7 0% 0%
Transport for Wales 0 1 0 1 — —
West Midlands Trains 1 1 0 2 50% —

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 0 0 0 0 — —
DB Cargo 0 0 0 0 — —
Direct Rail Services 0 0 0 0 — —
Freightliner Intermodal 0 0 0 0 — —
GB Railfreight 1 0 0 1 — —
Heavy Haul Rail 0 0 0 0 — —
Network Rail - Materials 23 2 0 25 92% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo