Realtime National Passenger Train Stats

Monday, 7 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 10:41:56

On Time

5000

85.6%

Late

842

14.4%

Cancelled / Very Late

249

4.3%

Total

5842

 

National PPM

85%

Rolling: 83%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London Overground

On Time

95.2%

Late

4.8%

Cancelled / Very Late

1.7%

Total Trains

417

PPM: 95%

Worst Performing Operator

Heathrow Express

On Time

7.8%

Late

92.2%

Cancelled / Very Late

72.7%

Total Trains

77

PPM: 7%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 43 16 4 59 72% 73%
c2c 54 33 4 87 62% 28%
Caledonian Sleeper Limited 2 1 0 3 66%
Chiltern 83 13 0 96 86% 76%
CrossCountry 48 5 2 53 90% 93%
East Midlands Railway 88 32 8 120 73% 65%
Elizabeth line 211 52 6 263 80% 80%
Grand Central 1 1 0 2 50% 50%
Great Western Railway 355 75 27 430 82% 76%
Greater Anglia 309 19 2 328 94% 91%
Greater Thameslink Railway 671 255 93 926 72% 71%
Heathrow Express 6 71 56 77 7% 18%
Hull Trains 2 0 0 2 100% 100%
London North Eastern Railway 34 3 0 37 91% 90%
London Overground 397 20 7 417 95% 93%
Lumo East Coast 2 0 0 2 100% 100%
Lumo West Coast 1 0 0 1 100% 100%
Merseyrail 147 8 6 155 94% 94%
Northern Trains 620 80 16 700 88% 88%
ScotRail 521 31 11 552 94% 92%
South Western Railway 347 79 26 426 81% 76%
Southeastern 445 64 14 509 87% 85%
TransPennine Trains 73 8 4 81 90% 90%
Transport for Wales 254 13 8 267 95% 91%
West Midlands Trains 298 35 11 333 89% 88%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 3 3 1 6 50% 50%
DB Cargo 30 3 0 33 90% 83%
Direct Rail Services 3 1 0 4 75%
Freightliner Intermodal 3 0 0 3 100%
GB Railfreight 27 6 0 33 81% 81%
Heavy Haul Rail 21 1 0 22 95% 80%
Network Rail - Materials 24 3 0 27 88% 33%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo