Realtime National Passenger Train Stats
Saturday, 12 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 04:03:56
On Time
158
82.3%
Late
34
17.7%
Cancelled / Very Late
12
6.2%
Total
192
National PPM
82%
Rolling: 68%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
TransPennine Trains
On Time
100.0%
Late
0.0%
Cancelled / Very Late
0.0%
Total Trains
12
PPM: 100%
Worst Performing Operator
Great Western Railway
On Time
66.7%
Late
33.3%
Cancelled / Very Late
14.3%
Total Trains
21
PPM: 66%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 0 | 0 | 0 | 0 | — | — |
| c2c | 3 | 1 | 0 | 4 | 75% | — |
| Caledonian Sleeper Limited | 0 | 0 | 0 | 0 | — | — |
| Chiltern | 3 | 1 | 0 | 4 | 75% | — |
| CrossCountry | 0 | 1 | 1 | 1 | — | — |
| East Midlands Railway | 0 | 0 | 0 | 0 | — | — |
| Elizabeth line | 4 | 3 | 1 | 7 | 57% | 0% |
| Grand Central | 0 | 0 | 0 | 0 | — | — |
| Great Western Railway | 14 | 7 | 3 | 21 | 66% | 16% |
| Greater Anglia | 18 | 1 | 0 | 19 | 94% | 100% |
| Greater Thameslink Railway | 25 | 11 | 5 | 36 | 69% | 52% |
| Heathrow Express | 0 | 0 | 0 | 0 | — | — |
| Hull Trains | 0 | 0 | 0 | 0 | — | — |
| London North Eastern Railway | 0 | 0 | 0 | 0 | — | — |
| London Overground | 37 | 1 | 0 | 38 | 97% | 100% |
| Lumo East Coast | 0 | 0 | 0 | 0 | — | — |
| Lumo West Coast | 0 | 0 | 0 | 0 | — | — |
| Merseyrail | 0 | 0 | 0 | 0 | — | — |
| Northern Trains | 1 | 0 | 0 | 1 | — | — |
| ScotRail | 1 | 0 | 0 | 1 | — | — |
| South Western Railway | 15 | 2 | 0 | 17 | 88% | — |
| Southeastern | 18 | 3 | 0 | 21 | 85% | — |
| TransPennine Trains | 12 | 0 | 0 | 12 | 100% | 100% |
| Transport for Wales | 5 | 1 | 1 | 6 | 83% | — |
| West Midlands Trains | 2 | 2 | 1 | 4 | 50% | 50% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 0 | 0 | 0 | 0 | — | — |
| DB Cargo | 7 | 0 | 0 | 7 | 100% | 100% |
| Direct Rail Services | 0 | 1 | 0 | 1 | — | — |
| Freightliner Intermodal | 0 | 0 | 0 | 0 | — | — |
| GB Railfreight | 2 | 0 | 0 | 2 | 100% | — |
| Heavy Haul Rail | 2 | 0 | 0 | 2 | 100% | — |
| Network Rail - Materials | 2 | 0 | 0 | 2 | 100% | — |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By