Realtime National Passenger Train Stats

Tuesday, 24 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 12:15:56

On Time

6357

80.7%

Late

1525

19.3%

Cancelled / Very Late

482

6.1%

Total

7882

 

National PPM

80%

Rolling: 80%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

58

PPM: 100%

Worst Performing Operator

London North Eastern Railway

On Time

32.1%

Late

67.9%

Cancelled / Very Late

67.9%

Total Trains

56

PPM: 32%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 61 29 7 90 67% 55%
c2c 114 30 6 144 79% 87%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 107 16 5 123 86% 91%
CrossCountry 62 21 7 83 74% 63%
East Midlands Railway 151 12 2 163 92% 89%
Elizabeth line 347 39 11 386 89% 93%
Grand Central 0 3 3 3 0% 0%
Great Western Railway 547 54 8 601 91% 89%
Greater Anglia 419 35 1 454 92% 93%
Greater Thameslink Railway 794 435 187 1229 64% 65%
Heathrow Express 58 0 0 58 100% 100%
Hull Trains 0 2 1 2 0% —
London North Eastern Railway 18 38 38 56 32% 3%
London Overground 516 37 14 553 93% 95%
Lumo East Coast 1 2 2 3 33% 0%
Lumo West Coast 1 1 0 2 50% 0%
Merseyrail 196 18 11 214 91% 96%
Northern Trains 696 238 63 934 74% 71%
ScotRail 628 112 16 740 84% 87%
South Western Railway 395 151 46 546 72% 77%
Southeastern 528 119 21 647 81% 69%
TransPennine Trains 73 31 9 104 70% 59%
Transport for Wales 313 58 25 371 84% 87%
West Midlands Trains 390 52 5 442 88% 88%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 6 1 0 7 85% 66%
DB Cargo 36 15 0 51 70% 40%
Direct Rail Services 11 1 0 12 91% —
Freightliner Intermodal 17 2 0 19 89% 100%
GB Railfreight 31 5 1 36 86% 78%
Heavy Haul Rail 26 7 0 33 78% 87%
Network Rail - Materials 59 2 0 61 96% 71%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo