Realtime National Passenger Train Stats

Friday, 20 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 21:11:56

On Time

15541

81.1%

Late

3612

18.9%

Cancelled / Very Late

1079

5.6%

Total

19153

 

National PPM

81%

Rolling: 75%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Chiltern

On Time

97.9%

Late

2.1%

Cancelled / Very Late

0.7%

Total Trains

286

PPM: 97%

Worst Performing Operator

CrossCountry

On Time

50.6%

Late

49.4%

Cancelled / Very Late

34.3%

Total Trains

233

PPM: 50%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 152 110 24 262 58% 55%
c2c 274 40 23 314 87% 94%
Caledonian Sleeper Limited 1 2 2 3 33% —
Chiltern 280 6 2 286 97% 97%
CrossCountry 118 115 80 233 50% 31%
East Midlands Railway 337 78 17 415 81% 69%
Elizabeth line 803 96 21 899 89% 93%
Grand Central 9 8 1 17 52% 100%
Great Western Railway 1156 293 95 1449 79% 85%
Greater Anglia 1025 62 15 1087 94% 89%
Greater Thameslink Railway 2311 560 180 2871 80% 76%
Heathrow Express 105 23 3 128 82% 100%
Hull Trains 10 1 0 11 90% —
London North Eastern Railway 96 62 23 158 60% 76%
London Overground 1209 126 47 1335 90% 76%
Lumo East Coast 2 6 4 8 25% 0%
Lumo West Coast 5 3 0 8 62% 100%
Merseyrail 515 24 6 539 95% 93%
Northern Trains 1756 530 104 2286 76% 72%
ScotRail 1467 434 144 1901 77% 57%
South Western Railway 1010 378 132 1388 72% 79%
Southeastern 1283 239 24 1522 84% 73%
TransPennine Trains 190 64 9 254 74% 78%
Transport for Wales 710 177 90 887 80% 68%
West Midlands Trains 848 216 41 1064 79% 66%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 15 0 0 15 100% 100%
DB Cargo 80 11 0 91 87% 87%
Direct Rail Services 11 5 0 16 68% —
Freightliner Intermodal 32 8 0 40 80% 66%
GB Railfreight 75 14 1 89 84% 82%
Heavy Haul Rail 54 7 0 61 88% 83%
Network Rail - Materials 81 10 0 91 89% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo