Realtime National Passenger Train Stats

Wednesday, 25 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 13:47:56

On Time

8399

86.2%

Late

1350

13.8%

Cancelled / Very Late

345

3.5%

Total

9749

 

National PPM

86%

Rolling: 88%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

99.3%

Late

0.7%

Cancelled / Very Late

0.0%

Total Trains

273

PPM: 99%

Worst Performing Operator

CrossCountry

On Time

60.9%

Late

39.1%

Cancelled / Very Late

29.6%

Total Trains

115

PPM: 60%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 99 21 1 120 82% 67%
c2c 143 25 10 168 85% 81%
Caledonian Sleeper Limited 2 1 1 3 66% —
Chiltern 136 9 0 145 93% 87%
CrossCountry 70 45 34 115 60% 57%
East Midlands Railway 178 27 5 205 86% 87%
Elizabeth line 445 20 12 465 95% 100%
Grand Central 4 2 0 6 66% 100%
Great Western Railway 649 95 25 744 87% 91%
Greater Anglia 526 39 12 565 93% 91%
Greater Thameslink Railway 1225 257 43 1482 82% 86%
Heathrow Express 66 4 0 70 94% 100%
Hull Trains 3 3 2 6 50% 66%
London North Eastern Railway 65 8 2 73 89% 96%
London Overground 651 19 11 670 97% 95%
Lumo East Coast 3 1 0 4 75% 0%
Lumo West Coast 3 0 0 3 100% 100%
Merseyrail 271 2 0 273 99% 98%
Northern Trains 926 224 46 1150 80% 87%
ScotRail 848 110 39 958 88% 90%
South Western Railway 536 152 38 688 77% 77%
Southeastern 639 133 15 772 82% 84%
TransPennine Trains 93 38 13 131 70% 81%
Transport for Wales 412 50 13 462 89% 86%
West Midlands Trains 485 75 25 560 86% 91%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 11 0 0 11 100% 100%
DB Cargo 59 6 0 65 90% 83%
Direct Rail Services 13 0 0 13 100% 100%
Freightliner Intermodal 22 3 0 25 88% 88%
GB Railfreight 35 12 1 47 74% 64%
Heavy Haul Rail 33 7 0 40 82% 81%
Network Rail - Materials 68 7 0 75 90% 87%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo