Realtime National Passenger Train Stats

Sunday, 11 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 22:26:56

On Time

10684

87.3%

Late

1554

12.7%

Cancelled / Very Late

476

3.9%

Total

12238

 

National PPM

87%

Rolling: 85%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Hull Trains

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

11

PPM: 100%

Worst Performing Operator

Grand Central

On Time

75.0%

Late

25.0%

Cancelled / Very Late

6.2%

Total Trains

16

PPM: 75%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 85 20 3 105 80% 65%
c2c 122 3 1 125 97% 87%
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 158 11 0 169 93% 95%
CrossCountry 125 20 13 145 86% 88%
East Midlands Railway 208 63 23 271 76% 59%
Elizabeth line 694 33 22 727 95% 98%
Grand Central 12 4 1 16 75% 0%
Great Western Railway 759 117 43 876 86% 90%
Greater Anglia 708 25 2 733 96% 99%
Greater Thameslink Railway 1465 402 94 1867 78% 70%
Heathrow Express 118 19 11 137 86% 100%
Hull Trains 11 0 0 11 100% 100%
London North Eastern Railway 130 11 1 141 92% 92%
London Overground 1099 69 26 1168 94% 89%
Lumo East Coast 7 1 0 8 87% 100%
Lumo West Coast 0 0 0 0 — —
Merseyrail 389 7 2 396 98% 100%
Northern Trains 1028 136 34 1164 88% 91%
ScotRail 842 137 76 979 86% 82%
South Western Railway 951 152 38 1103 86% 96%
Southeastern 722 115 19 837 86% 84%
TransPennine Trains 199 35 8 234 85% 85%
Transport for Wales 530 89 17 619 85% 75%
West Midlands Trains 470 109 54 579 81% 83%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 13 11 5 24 54% 37%
DB Cargo 12 3 0 15 80% 100%
Direct Rail Services 3 0 0 3 100% 100%
Freightliner Intermodal 1 0 0 1 — —
GB Railfreight 18 7 0 25 72% 100%
Heavy Haul Rail 1 0 0 1 — —
Network Rail - Materials 82 13 0 95 86% 83%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo