Realtime National Passenger Train Stats

Thursday, 29 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 08:35:56

On Time

2583

84.3%

Late

481

15.7%

Cancelled / Very Late

122

4.0%

Total

3064

 

National PPM

84%

Rolling: 83%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

28

PPM: 100%

Worst Performing Operator

Avanti West Coast

On Time

50.0%

Late

50.0%

Cancelled / Very Late

22.7%

Total Trains

22

PPM: 50%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 11 11 5 22 50% 50%
c2c 36 12 3 48 75% 75%
Caledonian Sleeper Limited 2 0 0 2 100% 100%
Chiltern 38 11 6 49 77% 72%
CrossCountry 22 2 1 24 91% 94%
East Midlands Railway 52 14 4 66 78% 78%
Elizabeth line 163 3 1 166 98% 98%
Grand Central 0 0 0 0 — —
Great Western Railway 210 31 6 241 87% 87%
Greater Anglia 181 16 3 197 91% 93%
Greater Thameslink Railway 448 60 11 508 88% 88%
Heathrow Express 28 0 0 28 100% 100%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 11 1 0 12 91% 91%
London Overground 200 21 16 221 90% 90%
Lumo East Coast 0 1 1 1 0% 0%
Lumo West Coast 0 0 0 0 — —
Merseyrail 41 19 2 60 68% 66%
Northern Trains 290 72 14 362 80% 80%
ScotRail 198 56 8 254 77% 76%
South Western Railway 150 58 14 208 72% 71%
Southeastern 276 24 6 300 92% 94%
TransPennine Trains 50 6 2 56 89% 91%
Transport for Wales 88 24 11 112 78% 75%
West Midlands Trains 116 40 9 156 74% 74%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 4 4 0 8 50% 66%
DB Cargo 19 3 0 22 86% 77%
Direct Rail Services 6 0 0 6 100% 100%
Freightliner Intermodal 5 0 0 5 100% 100%
GB Railfreight 10 1 0 11 90% 100%
Heavy Haul Rail 16 2 0 18 88% 85%
Network Rail - Materials 49 4 0 53 92% 83%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo