Realtime National Passenger Train Stats

Tuesday, 20 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 22:31:56

On Time

17060

82.7%

Late

3561

17.3%

Cancelled / Very Late

861

4.2%

Total

20621

 

National PPM

82%

Rolling: 84%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

98.4%

Late

1.6%

Cancelled / Very Late

0.4%

Total Trains

569

PPM: 98%

Worst Performing Operator

Avanti West Coast

On Time

50.5%

Late

49.5%

Cancelled / Very Late

9.5%

Total Trains

283

PPM: 50%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 143 140 27 283 50% 54%
c2c 275 60 18 335 82% 67%
Caledonian Sleeper Limited 2 1 0 3 66% —
Chiltern 289 31 2 320 90% 96%
CrossCountry 189 55 18 244 77% 86%
East Midlands Railway 384 71 8 455 84% 76%
Elizabeth line 779 182 72 961 81% 100%
Grand Central 15 3 0 18 83% 0%
Great Western Railway 1176 366 156 1542 76% 85%
Greater Anglia 1117 60 1 1177 94% 93%
Greater Thameslink Railway 2455 611 129 3066 80% 80%
Heathrow Express 100 40 10 140 71% 100%
Hull Trains 13 1 0 14 92% 50%
London North Eastern Railway 149 26 3 175 85% 75%
London Overground 1304 128 37 1432 91% 83%
Lumo East Coast 8 2 0 10 80% 100%
Lumo West Coast 6 1 0 7 85% 50%
Merseyrail 560 9 2 569 98% 100%
Northern Trains 2044 461 71 2505 81% 84%
ScotRail 1691 332 64 2023 83% 89%
South Western Railway 1159 338 87 1497 77% 84%
Southeastern 1374 245 17 1619 84% 82%
TransPennine Trains 223 54 19 277 80% 78%
Transport for Wales 753 210 98 963 78% 75%
West Midlands Trains 994 181 32 1175 84% 85%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 20 1 1 21 95% —
DB Cargo 92 9 0 101 91% 80%
Direct Rail Services 25 2 0 27 92% 50%
Freightliner Intermodal 41 7 0 48 85% 80%
GB Railfreight 92 10 1 102 90% 93%
Heavy Haul Rail 69 8 0 77 89% 100%
Network Rail - Materials 62 8 0 70 88% —

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo