Realtime National Passenger Train Stats

Thursday, 26 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 20:06:56

On Time

14629

82.0%

Late

3221

18.0%

Cancelled / Very Late

956

5.4%

Total

17850

 

National PPM

81%

Rolling: 68%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Hull Trains

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

11

PPM: 100%

Worst Performing Operator

Grand Central

On Time

62.5%

Late

37.5%

Cancelled / Very Late

0.0%

Total Trains

16

PPM: 62%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 196 44 3 240 81% 60%
c2c 231 64 37 295 78% 78%
Caledonian Sleeper Limited 1 2 1 3 33% —
Chiltern 232 38 6 270 85% 73%
CrossCountry 161 44 12 205 78% 67%
East Midlands Railway 294 88 21 382 76% 85%
Elizabeth line 646 186 60 832 77% 50%
Grand Central 10 6 0 16 62% 75%
Great Western Railway 1117 214 60 1331 83% 73%
Greater Anglia 939 78 9 1017 92% 79%
Greater Thameslink Railway 2164 493 87 2657 81% 54%
Heathrow Express 92 28 14 120 76% 81%
Hull Trains 11 0 0 11 100% 100%
London North Eastern Railway 130 14 2 144 90% 76%
London Overground 889 348 276 1237 71% 69%
Lumo East Coast 7 2 0 9 77% 50%
Lumo West Coast 6 1 0 7 85% 50%
Merseyrail 493 17 6 510 96% 98%
Northern Trains 1631 496 105 2127 76% 57%
ScotRail 1508 289 76 1797 83% 75%
South Western Railway 1040 259 27 1299 80% 77%
Southeastern 1199 199 22 1398 85% 70%
TransPennine Trains 171 63 34 234 73% 33%
Transport for Wales 704 119 51 823 85% 83%
West Midlands Trains 883 166 61 1049 84% 70%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 17 15 12 32 53% 100%
DB Cargo 92 15 0 107 85% 84%
Direct Rail Services 21 0 0 21 100% —
Freightliner Intermodal 36 5 0 41 87% 80%
GB Railfreight 79 19 1 98 80% 75%
Heavy Haul Rail 58 12 0 70 82% 100%
Network Rail - Materials 78 10 0 88 88% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo