Realtime National Passenger Train Stats

Wednesday, 25 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 22:44:56

On Time

17601

84.2%

Late

3311

15.8%

Cancelled / Very Late

804

3.8%

Total

20912

 

National PPM

84%

Rolling: 79%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Merseyrail

On Time

99.7%

Late

0.3%

Cancelled / Very Late

0.0%

Total Trains

578

PPM: 99%

Worst Performing Operator

CrossCountry

On Time

60.9%

Late

39.1%

Cancelled / Very Late

28.9%

Total Trains

253

PPM: 60%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 225 67 11 292 77% 47%
c2c 291 45 14 336 86% 87%
Caledonian Sleeper Limited 2 1 1 3 66% —
Chiltern 294 17 1 311 94% 90%
CrossCountry 154 99 73 253 60% 70%
East Midlands Railway 389 71 12 460 84% 77%
Elizabeth line 839 133 32 972 86% 82%
Grand Central 17 2 0 19 89% 100%
Great Western Railway 1376 203 58 1579 87% 83%
Greater Anglia 1102 90 16 1192 92% 87%
Greater Thameslink Railway 2561 532 86 3093 82% 81%
Heathrow Express 131 9 0 140 93% 92%
Hull Trains 10 4 2 14 71% 50%
London North Eastern Railway 150 27 5 177 84% 92%
London Overground 1336 124 64 1460 91% 90%
Lumo East Coast 9 1 0 10 90% 100%
Lumo West Coast 7 2 0 9 77% 50%
Merseyrail 576 2 0 578 99% 100%
Northern Trains 2103 421 73 2524 83% 90%
ScotRail 1843 239 47 2082 88% 85%
South Western Railway 1057 460 145 1517 69% 50%
Southeastern 1282 361 38 1643 78% 70%
TransPennine Trains 214 68 21 282 75% 78%
Transport for Wales 860 119 43 979 87% 77%
West Midlands Trains 947 232 64 1179 80% 66%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 24 1 1 25 96% 100%
DB Cargo 111 13 0 124 89% 100%
Direct Rail Services 26 0 0 26 100% 100%
Freightliner Intermodal 42 10 0 52 80% 66%
GB Railfreight 80 25 1 105 76% 75%
Heavy Haul Rail 70 9 0 79 88% 100%
Network Rail - Materials 86 13 0 99 86% 70%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo