Realtime National Passenger Train Stats

Monday, 23 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 11:44:56

On Time

6000

83.4%

Late

1192

16.6%

Cancelled / Very Late

331

4.6%

Total

7192

 

National PPM

83%

Rolling: 84%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

97.2%

Late

2.8%

Cancelled / Very Late

1.1%

Total Trains

361

PPM: 97%

Worst Performing Operator

c2c

On Time

68.7%

Late

31.3%

Cancelled / Very Late

9.7%

Total Trains

134

PPM: 68%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 59 19 1 78 75% 84%
c2c 92 42 13 134 68% 88%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 76 30 8 106 71% 76%
CrossCountry 57 15 4 72 79% 83%
East Midlands Railway 125 27 9 152 82% 77%
Elizabeth line 351 10 4 361 97% 100%
Grand Central 1 1 0 2 50% 50%
Great Western Railway 477 57 23 534 89% 89%
Greater Anglia 405 18 3 423 95% 98%
Greater Thameslink Railway 813 308 103 1121 72% 75%
Heathrow Express 50 3 0 53 94% 100%
Hull Trains 1 2 0 3 33% 50%
London North Eastern Railway 41 9 3 50 82% 68%
London Overground 479 24 12 503 95% 99%
Lumo East Coast 2 1 0 3 66% 50%
Lumo West Coast 1 0 0 1 100% —
Merseyrail 184 8 0 192 95% 98%
Northern Trains 696 156 34 852 81% 84%
ScotRail 526 154 46 680 77% 78%
South Western Railway 379 135 34 514 73% 66%
Southeastern 540 62 4 602 89% 82%
TransPennine Trains 81 11 2 92 88% 82%
Transport for Wales 295 37 18 332 88% 89%
West Midlands Trains 322 70 10 392 82% 84%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 5 1 0 6 83% —
DB Cargo 42 7 0 49 85% 86%
Direct Rail Services 5 1 0 6 83% —
Freightliner Intermodal 6 0 0 6 100% 100%
GB Railfreight 25 5 1 30 83% 70%
Heavy Haul Rail 14 3 0 17 82% 100%
Network Rail - Materials 34 4 0 38 89% —

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo