Realtime National Passenger Train Stats

Monday, 31 August 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 05:32:56

On Time

105

80.2%

Late

26

19.8%

Cancelled / Very Late

13

9.9%

Total

131

 

National PPM

80%

Rolling: 77%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

South Western Railway

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

10

PPM: 100%

Worst Performing Operator

Great Western Railway

On Time

56.5%

Late

43.5%

Cancelled / Very Late

21.7%

Total Trains

23

PPM: 56%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0
c2c 2 1 0 3 66% 100%
Caledonian Sleeper Limited 0 0 0 0
Chiltern 1 0 0 1
CrossCountry 1 1 1 2 50% 50%
East Midlands Railway 0 1 1 1
Elizabeth line 9 0 0 9 100% 100%
Grand Central 0 0 0 0
Great Western Railway 13 10 5 23 56% 46%
Greater Anglia 8 2 0 10 80% 100%
Greater Thameslink Railway 37 6 2 43 86% 90%
Heathrow Express 4 0 0 4 100% 100%
Hull Trains 0 0 0 0
London North Eastern Railway 0 0 0 0
London Overground 5 1 0 6 83%
Lumo East Coast 0 0 0 0
Lumo West Coast 0 0 0 0
Merseyrail 0 0 0 0
Northern Trains 0 2 2 2 0% 0%
ScotRail 2 0 0 2 100%
South Western Railway 10 0 0 10 100% 100%
Southeastern 5 0 0 5 100%
TransPennine Trains 6 2 2 8 75% 71%
Transport for Wales 4 0 0 4 100% 100%
West Midlands Trains 2 0 0 2 100%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 0 0 0 0
DB Cargo 10 0 0 10 100% 100%
Direct Rail Services 0 0 0 0
Freightliner Intermodal 0 0 0 0
GB Railfreight 0 0 0 0
Heavy Haul Rail 2 1 0 3 66% 100%
Network Rail - Materials 13 2 0 15 86% 81%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo