Realtime National Passenger Train Stats
Monday, 7 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 10:41:56
On Time
5000
85.6%
Late
842
14.4%
Cancelled / Very Late
249
4.3%
Total
5842
National PPM
85%
Rolling: 83%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
London Overground
On Time
95.2%
Late
4.8%
Cancelled / Very Late
1.7%
Total Trains
417
PPM: 95%
Worst Performing Operator
Heathrow Express
On Time
7.8%
Late
92.2%
Cancelled / Very Late
72.7%
Total Trains
77
PPM: 7%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 43 | 16 | 4 | 59 | 72% | 73% |
| c2c | 54 | 33 | 4 | 87 | 62% | 28% |
| Caledonian Sleeper Limited | 2 | 1 | 0 | 3 | 66% | — |
| Chiltern | 83 | 13 | 0 | 96 | 86% | 76% |
| CrossCountry | 48 | 5 | 2 | 53 | 90% | 93% |
| East Midlands Railway | 88 | 32 | 8 | 120 | 73% | 65% |
| Elizabeth line | 211 | 52 | 6 | 263 | 80% | 80% |
| Grand Central | 1 | 1 | 0 | 2 | 50% | 50% |
| Great Western Railway | 355 | 75 | 27 | 430 | 82% | 76% |
| Greater Anglia | 309 | 19 | 2 | 328 | 94% | 91% |
| Greater Thameslink Railway | 671 | 255 | 93 | 926 | 72% | 71% |
| Heathrow Express | 6 | 71 | 56 | 77 | 7% | 18% |
| Hull Trains | 2 | 0 | 0 | 2 | 100% | 100% |
| London North Eastern Railway | 34 | 3 | 0 | 37 | 91% | 90% |
| London Overground | 397 | 20 | 7 | 417 | 95% | 93% |
| Lumo East Coast | 2 | 0 | 0 | 2 | 100% | 100% |
| Lumo West Coast | 1 | 0 | 0 | 1 | 100% | 100% |
| Merseyrail | 147 | 8 | 6 | 155 | 94% | 94% |
| Northern Trains | 620 | 80 | 16 | 700 | 88% | 88% |
| ScotRail | 521 | 31 | 11 | 552 | 94% | 92% |
| South Western Railway | 347 | 79 | 26 | 426 | 81% | 76% |
| Southeastern | 445 | 64 | 14 | 509 | 87% | 85% |
| TransPennine Trains | 73 | 8 | 4 | 81 | 90% | 90% |
| Transport for Wales | 254 | 13 | 8 | 267 | 95% | 91% |
| West Midlands Trains | 298 | 35 | 11 | 333 | 89% | 88% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 3 | 3 | 1 | 6 | 50% | 50% |
| DB Cargo | 30 | 3 | 0 | 33 | 90% | 83% |
| Direct Rail Services | 3 | 1 | 0 | 4 | 75% | — |
| Freightliner Intermodal | 3 | 0 | 0 | 3 | 100% | — |
| GB Railfreight | 27 | 6 | 0 | 33 | 81% | 81% |
| Heavy Haul Rail | 21 | 1 | 0 | 22 | 95% | 80% |
| Network Rail - Materials | 24 | 3 | 0 | 27 | 88% | 33% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.