Realtime National Passenger Train Stats

Sunday, 25 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 08:55:56

On Time

187

58.4%

Late

133

41.6%

Cancelled / Very Late

91

28.4%

Total

320

 

National PPM

58%

Rolling: 56%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

28

PPM: 100%

Worst Performing Operator

TransPennine Trains

On Time

0.0%

Late

100.0%

Cancelled / Very Late

100.0%

Total Trains

11

PPM: 0%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 4 4 4 0% 0%
c2c 4 0 0 4 100% —
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 0 1 0 1 — —
CrossCountry 0 4 4 4 0% 0%
East Midlands Railway 2 0 0 2 100% 100%
Elizabeth line 28 0 0 28 100% 100%
Grand Central 0 0 0 0 — —
Great Western Railway 12 9 8 21 57% 90%
Greater Anglia 9 4 4 13 69% 40%
Greater Thameslink Railway 39 27 12 66 59% 76%
Heathrow Express 24 1 0 25 96% 100%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 33 11 8 44 75% 42%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 2 1 0 3 66% 66%
Northern Trains 1 21 20 22 4% 4%
ScotRail 0 8 8 8 0% 0%
South Western Railway 27 15 7 42 64% 100%
Southeastern 21 11 2 32 65% —
TransPennine Trains 0 11 11 11 0% 0%
Transport for Wales 3 4 3 7 42% 50%
West Midlands Trains 6 2 0 8 75% 83%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 0 0 0 0 — —
DB Cargo 0 0 0 0 — —
Direct Rail Services 0 0 0 0 — —
Freightliner Intermodal 0 0 0 0 — —
GB Railfreight 1 0 0 1 — —
Heavy Haul Rail 0 0 0 0 — —
Network Rail - Materials 38 2 0 40 95% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo