Realtime National Passenger Train Stats
Friday, 27 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 01:20:56
On Time
18498
81.1%
Late
4311
18.9%
Cancelled / Very Late
1273
5.6%
Total
22809
National PPM
81%
Rolling: 78%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
96.5%
Late
3.5%
Cancelled / Very Late
1.1%
Total Trains
621
PPM: 96%
Worst Performing Operator
Grand Central
On Time
60.0%
Late
40.0%
Cancelled / Very Late
0.0%
Total Trains
20
PPM: 60%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 248 | 68 | 9 | 316 | 78% | 71% |
| c2c | 283 | 83 | 54 | 366 | 77% | 61% |
| Caledonian Sleeper Limited | 4 | 2 | 1 | 6 | 66% | 100% |
| Chiltern | 294 | 46 | 6 | 340 | 86% | 95% |
| CrossCountry | 209 | 70 | 22 | 279 | 74% | 70% |
| East Midlands Railway | 404 | 100 | 25 | 504 | 80% | 96% |
| Elizabeth line | 841 | 206 | 63 | 1047 | 80% | 95% |
| Grand Central | 12 | 8 | 0 | 20 | 60% | — |
| Great Western Railway | 1390 | 302 | 95 | 1692 | 82% | 70% |
| Greater Anglia | 1194 | 110 | 19 | 1304 | 91% | 86% |
| Greater Thameslink Railway | 2665 | 713 | 129 | 3378 | 78% | 79% |
| Heathrow Express | 123 | 29 | 14 | 152 | 80% | 100% |
| Hull Trains | 13 | 1 | 0 | 14 | 92% | — |
| London North Eastern Railway | 174 | 21 | 4 | 195 | 89% | 84% |
| London Overground | 1161 | 440 | 346 | 1601 | 72% | 58% |
| Lumo East Coast | 10 | 2 | 0 | 12 | 83% | 100% |
| Lumo West Coast | 9 | 1 | 0 | 10 | 90% | — |
| Merseyrail | 599 | 22 | 7 | 621 | 96% | 100% |
| Northern Trains | 2092 | 640 | 135 | 2732 | 76% | 75% |
| ScotRail | 1818 | 458 | 131 | 2276 | 79% | 71% |
| South Western Railway | 1363 | 315 | 33 | 1678 | 81% | 81% |
| Southeastern | 1530 | 263 | 22 | 1793 | 85% | 76% |
| TransPennine Trains | 228 | 82 | 43 | 310 | 73% | 84% |
| Transport for Wales | 903 | 149 | 60 | 1052 | 85% | 82% |
| West Midlands Trains | 1098 | 221 | 69 | 1319 | 83% | 91% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 25 | 15 | 12 | 40 | 62% | 100% |
| DB Cargo | 118 | 18 | 0 | 136 | 86% | 90% |
| Direct Rail Services | 31 | 0 | 0 | 31 | 100% | 100% |
| Freightliner Intermodal | 50 | 8 | 0 | 58 | 86% | 77% |
| GB Railfreight | 116 | 23 | 2 | 139 | 83% | 81% |
| Heavy Haul Rail | 78 | 14 | 0 | 92 | 84% | 83% |
| Network Rail - Materials | 101 | 23 | 0 | 124 | 81% | 61% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By