Realtime National Passenger Train Stats

Friday, 2 October 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 02:21:56

On Time

85

82.5%

Late

18

17.5%

Cancelled / Very Late

3

2.9%

Total

103

 

National PPM

82%

Rolling: —

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Great Western Railway

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

13

PPM: 100%

Worst Performing Operator

Greater Thameslink Railway

On Time

69.2%

Late

30.8%

Cancelled / Very Late

7.7%

Total Trains

26

PPM: 69%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0 — —
c2c 4 0 0 4 100% —
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 3 0 0 3 100% —
CrossCountry 0 0 0 0 — —
East Midlands Railway 0 0 0 0 — —
Elizabeth line 4 0 0 4 100% —
Grand Central 0 0 0 0 — —
Great Western Railway 13 0 0 13 100% —
Greater Anglia 7 1 0 8 87% —
Greater Thameslink Railway 18 8 2 26 69% —
Heathrow Express 0 0 0 0 — —
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 6 0 0 6 100% —
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 0 0 0 0 — —
Northern Trains 2 0 0 2 100% —
ScotRail 0 1 0 1 — —
South Western Railway 6 0 0 6 100% —
Southeastern 16 6 0 22 72% —
TransPennine Trains 2 1 1 3 66% —
Transport for Wales 2 0 0 2 100% —
West Midlands Trains 2 1 0 3 66% —

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 1 0 0 1 — —
DB Cargo 1 0 0 1 — —
Direct Rail Services 0 0 0 0 — —
Freightliner Intermodal 0 0 0 0 — —
GB Railfreight 1 0 0 1 — —
Heavy Haul Rail 1 0 0 1 — —
Network Rail - Materials 11 1 0 12 91% —

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo