Realtime National Passenger Train Stats
Sunday, 27 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 22:22:56
On Time
9471
82.8%
Late
1961
17.2%
Cancelled / Very Late
762
6.7%
Total
11432
National PPM
82%
Rolling: 80%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Merseyrail
On Time
98.2%
Late
1.8%
Cancelled / Very Late
1.1%
Total Trains
277
PPM: 98%
Worst Performing Operator
Greater Thameslink Railway
On Time
66.1%
Late
33.9%
Cancelled / Very Late
20.4%
Total Trains
1565
PPM: 66%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 154 | 45 | 0 | 199 | 77% | 97% |
| c2c | 168 | 8 | 1 | 176 | 95% | 90% |
| Caledonian Sleeper Limited | 0 | 0 | 0 | 0 | — | — |
| Chiltern | 140 | 29 | 13 | 169 | 82% | 77% |
| CrossCountry | 104 | 34 | 20 | 138 | 75% | 80% |
| East Midlands Railway | 175 | 51 | 17 | 226 | 77% | 81% |
| Elizabeth line | 548 | 76 | 38 | 624 | 87% | 94% |
| Grand Central | 13 | 4 | 1 | 17 | 76% | 75% |
| Great Western Railway | 646 | 156 | 29 | 802 | 80% | 79% |
| Greater Anglia | 748 | 41 | 2 | 789 | 94% | 88% |
| Greater Thameslink Railway | 1035 | 530 | 319 | 1565 | 66% | 59% |
| Heathrow Express | 63 | 25 | 0 | 88 | 71% | 100% |
| Hull Trains | 8 | 3 | 2 | 11 | 72% | 100% |
| London North Eastern Railway | 85 | 41 | 14 | 126 | 67% | 86% |
| London Overground | 886 | 141 | 86 | 1027 | 86% | 74% |
| Lumo East Coast | 7 | 2 | 0 | 9 | 77% | 100% |
| Lumo West Coast | 6 | 1 | 0 | 7 | 85% | 100% |
| Merseyrail | 272 | 5 | 3 | 277 | 98% | 100% |
| Northern Trains | 977 | 164 | 36 | 1141 | 85% | 82% |
| ScotRail | 917 | 99 | 30 | 1016 | 90% | 90% |
| South Western Railway | 764 | 224 | 63 | 988 | 77% | 80% |
| Southeastern | 742 | 98 | 19 | 840 | 88% | 77% |
| TransPennine Trains | 198 | 29 | 24 | 227 | 87% | 67% |
| Transport for Wales | 476 | 63 | 9 | 539 | 88% | 79% |
| West Midlands Trains | 436 | 127 | 39 | 563 | 77% | 80% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 12 | 2 | 1 | 14 | 85% | — |
| DB Cargo | 17 | 1 | 0 | 18 | 94% | 100% |
| Direct Rail Services | 3 | 0 | 0 | 3 | 100% | — |
| Freightliner Intermodal | 0 | 0 | 0 | 0 | — | — |
| GB Railfreight | 15 | 4 | 0 | 19 | 78% | 75% |
| Heavy Haul Rail | 0 | 0 | 0 | 0 | — | — |
| Network Rail - Materials | 85 | 16 | 0 | 101 | 84% | 77% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By