Realtime National Passenger Train Stats

Friday, 25 September 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 06:15:56

On Time

377

87.3%

Late

55

12.7%

Cancelled / Very Late

27

6.2%

Total

432

 

National PPM

87%

Rolling: 91%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

10

PPM: 100%

Worst Performing Operator

Northern Trains

On Time

60.9%

Late

39.1%

Cancelled / Very Late

39.1%

Total Trains

23

PPM: 60%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 0 0 0 0 — —
c2c 9 3 0 12 75% 87%
Caledonian Sleeper Limited 0 0 0 0 — —
Chiltern 5 0 0 5 100% —
CrossCountry 2 0 0 2 100% 100%
East Midlands Railway 2 1 0 3 66% 66%
Elizabeth line 24 1 0 25 96% 100%
Grand Central 0 0 0 0 — —
Great Western Railway 43 9 7 52 82% 83%
Greater Anglia 24 9 1 33 72% 88%
Greater Thameslink Railway 100 15 7 115 86% 90%
Heathrow Express 10 0 0 10 100% 100%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 0 0 0 0 — —
London Overground 22 0 0 22 100% 100%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 1 0 0 1 — —
Northern Trains 14 9 9 23 60% 68%
ScotRail 10 1 0 11 90% 100%
South Western Railway 18 2 2 20 90% 92%
Southeastern 55 2 0 57 96% 100%
TransPennine Trains 14 1 0 15 93% 100%
Transport for Wales 23 0 0 23 100% 100%
West Midlands Trains 11 2 1 13 84% 88%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 2 0 0 2 100% —
DB Cargo 4 0 0 4 100% —
Direct Rail Services 1 0 0 1 — —
Freightliner Intermodal 3 0 0 3 100% 100%
GB Railfreight 2 0 0 2 100% 100%
Heavy Haul Rail 8 2 0 10 80% 66%
Network Rail - Materials 39 2 0 41 95% 96%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo