Realtime National Passenger Train Stats

Thursday, 12 November 2026

Connection status: Connecting…

Follow the site's progress

Leave your email to hear about new features as they land.

Last updated: 13:13:56

On Time

6961

77.9%

Late

1971

22.1%

Cancelled / Very Late

677

7.6%

Total

8932

 

National PPM

77%

Rolling: 78%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Heathrow Express

On Time

98.4%

Late

1.6%

Cancelled / Very Late

0.0%

Total Trains

64

PPM: 98%

Worst Performing Operator

Chiltern

On Time

28.7%

Late

71.3%

Cancelled / Very Late

38.5%

Total Trains

122

PPM: 28%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 69 39 1 108 63% 60%
c2c 120 40 9 160 75% 83%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 35 87 47 122 28% 50%
CrossCountry 77 17 5 94 81% 71%
East Midlands Railway 160 28 5 188 85% 83%
Elizabeth line 399 34 13 433 92% 79%
Grand Central 3 2 0 5 60% 66%
Great Western Railway 603 75 22 678 88% 93%
Greater Anglia 438 81 34 519 84% 82%
Greater Thameslink Railway 844 560 244 1404 60% 58%
Heathrow Express 63 1 0 64 98% 100%
Hull Trains 5 0 0 5 100% 100%
London North Eastern Railway 60 5 1 65 92% 91%
London Overground 507 122 70 629 80% 83%
Lumo East Coast 3 1 0 4 75% 100%
Lumo West Coast 2 1 1 3 66% 100%
Merseyrail 239 12 5 251 95% 94%
Northern Trains 786 281 80 1067 73% 75%
ScotRail 750 119 16 869 86% 87%
South Western Railway 540 88 13 628 85% 89%
Southeastern 590 145 16 735 80% 79%
TransPennine Trains 100 17 2 117 85% 82%
Transport for Wales 320 97 52 417 76% 76%
West Midlands Trains 322 124 42 446 72% 70%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 9 5 4 14 64% 40%
DB Cargo 47 4 0 51 92% 100%
Direct Rail Services 9 2 0 11 81% 100%
Freightliner Intermodal 20 3 0 23 86% 85%
GB Railfreight 47 7 1 54 87% 87%
Heavy Haul Rail 27 6 0 33 81% 88%
Network Rail - Materials 56 3 0 59 94% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress

Leave your email to hear about new features as they land.

Data Provided By

Network Rail logo