Realtime National Passenger Train Stats
Wednesday, 4 November 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 08:16:56
On Time
2299
86.1%
Late
371
13.9%
Cancelled / Very Late
118
4.4%
Total
2670
National PPM
86%
Rolling: 86%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
London Overground
On Time
97.9%
Late
2.1%
Cancelled / Very Late
0.5%
Total Trains
190
PPM: 97%
Worst Performing Operator
London North Eastern Railway
On Time
61.5%
Late
38.5%
Cancelled / Very Late
30.8%
Total Trains
13
PPM: 61%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 11 | 1 | 0 | 12 | 91% | 91% |
| c2c | 33 | 9 | 4 | 42 | 78% | 76% |
| Caledonian Sleeper Limited | 2 | 0 | 0 | 2 | 100% | 100% |
| Chiltern | 35 | 9 | 2 | 44 | 79% | 77% |
| CrossCountry | 15 | 4 | 1 | 19 | 78% | 81% |
| East Midlands Railway | 47 | 8 | 3 | 55 | 85% | 88% |
| Elizabeth line | 103 | 43 | 27 | 146 | 70% | 69% |
| Grand Central | 0 | 0 | 0 | 0 | — | — |
| Great Western Railway | 153 | 37 | 15 | 190 | 80% | 79% |
| Greater Anglia | 155 | 13 | 6 | 168 | 92% | 91% |
| Greater Thameslink Railway | 429 | 52 | 13 | 481 | 89% | 90% |
| Heathrow Express | 22 | 3 | 2 | 25 | 88% | 93% |
| Hull Trains | 0 | 0 | 0 | 0 | — | — |
| London North Eastern Railway | 8 | 5 | 4 | 13 | 61% | 61% |
| London Overground | 186 | 4 | 1 | 190 | 97% | 98% |
| Lumo East Coast | 0 | 0 | 0 | 0 | — | — |
| Lumo West Coast | 0 | 0 | 0 | 0 | — | — |
| Merseyrail | 58 | 3 | 0 | 61 | 95% | 95% |
| Northern Trains | 252 | 59 | 15 | 311 | 81% | 83% |
| ScotRail | 184 | 33 | 9 | 217 | 84% | 86% |
| South Western Railway | 148 | 26 | 5 | 174 | 85% | 84% |
| Southeastern | 228 | 24 | 6 | 252 | 90% | 87% |
| TransPennine Trains | 38 | 2 | 0 | 40 | 95% | 96% |
| Transport for Wales | 113 | 11 | 3 | 124 | 91% | 90% |
| West Midlands Trains | 101 | 28 | 4 | 129 | 78% | 77% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 3 | 0 | 0 | 3 | 100% | — |
| DB Cargo | 24 | 1 | 0 | 25 | 96% | 87% |
| Direct Rail Services | 1 | 1 | 0 | 2 | 50% | 50% |
| Freightliner Intermodal | 4 | 1 | 0 | 5 | 80% | 66% |
| GB Railfreight | 17 | 3 | 0 | 20 | 85% | 81% |
| Heavy Haul Rail | 21 | 3 | 0 | 24 | 87% | 87% |
| Network Rail - Materials | 47 | 3 | 0 | 50 | 94% | 100% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By