Realtime National Passenger Train Stats
Thursday, 17 September 2026
Connection status: Connecting…
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Last updated: 09:35:56
On Time
3780
82.6%
Late
797
17.4%
Cancelled / Very Late
253
5.5%
Total
4577
National PPM
82%
Rolling: 81%
Counts are for today so far — every train is counted once, on arrival at its final destination.
Best Performing Operator
Heathrow Express
On Time
100.0%
Late
0.0%
Cancelled / Very Late
0.0%
Total Trains
36
PPM: 100%
Worst Performing Operator
c2c
On Time
27.1%
Late
72.9%
Cancelled / Very Late
38.8%
Total Trains
85
PPM: 27%
Passenger Operators
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Avanti West Coast | 20 | 39 | 33 | 59 | 33% | 66% |
| c2c | 23 | 62 | 33 | 85 | 27% | 12% |
| Caledonian Sleeper Limited | 2 | 0 | 0 | 2 | 100% | — |
| Chiltern | 69 | 8 | 0 | 77 | 89% | 88% |
| CrossCountry | 33 | 8 | 4 | 41 | 80% | 82% |
| East Midlands Railway | 75 | 15 | 6 | 90 | 83% | 81% |
| Elizabeth line | 221 | 16 | 2 | 237 | 93% | 95% |
| Grand Central | 0 | 0 | 0 | 0 | — | — |
| Great Western Railway | 312 | 22 | 3 | 334 | 93% | 94% |
| Greater Anglia | 201 | 67 | 18 | 268 | 75% | 74% |
| Greater Thameslink Railway | 531 | 214 | 59 | 745 | 71% | 66% |
| Heathrow Express | 36 | 0 | 0 | 36 | 100% | 100% |
| Hull Trains | 1 | 0 | 0 | 1 | — | — |
| London North Eastern Railway | 16 | 6 | 3 | 22 | 72% | 93% |
| London Overground | 269 | 48 | 13 | 317 | 84% | 79% |
| Lumo East Coast | 1 | 0 | 0 | 1 | 100% | 100% |
| Lumo West Coast | 0 | 0 | 0 | 0 | — | — |
| Merseyrail | 104 | 9 | 5 | 113 | 92% | 93% |
| Northern Trains | 449 | 71 | 16 | 520 | 86% | 85% |
| ScotRail | 393 | 10 | 1 | 403 | 97% | 96% |
| South Western Railway | 249 | 67 | 16 | 316 | 78% | 74% |
| Southeastern | 361 | 52 | 7 | 413 | 87% | 82% |
| TransPennine Trains | 56 | 6 | 2 | 62 | 90% | 100% |
| Transport for Wales | 191 | 16 | 3 | 207 | 92% | 94% |
| West Midlands Trains | 205 | 61 | 29 | 266 | 77% | 77% |
Freight Operators
Freight PPM counts trains arriving within 15 minutes of schedule.
| Operator | On Time | Late | Cxl / V. Late | Total | PPM | Rolling |
|---|---|---|---|---|---|---|
| Colas Freight | 4 | 1 | 0 | 5 | 80% | 50% |
| DB Cargo | 15 | 3 | 0 | 18 | 83% | — |
| Direct Rail Services | 6 | 1 | 0 | 7 | 85% | 66% |
| Freightliner Intermodal | 10 | 0 | 0 | 10 | 100% | 100% |
| GB Railfreight | 21 | 1 | 0 | 22 | 95% | 100% |
| Heavy Haul Rail | 17 | 1 | 0 | 18 | 94% | 83% |
| Network Rail - Materials | 49 | 2 | 0 | 51 | 96% | 66% |
How is performance measured?
The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.
Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.
Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.
Note: Data is approximate and may not be 100% accurate.
Follow the site's progress
Leave your email to hear about new features as they land.
Occasional development updates only — your address is never shared.
Data Provided By