Last updated: 10:01:56

On Time

4193

83.0%

Late

858

17.0%

Cancelled / Very Late

254

5.0%

Total

5051

 

National PPM

83%

Rolling: 81%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

Elizabeth line

On Time

96.2%

Late

3.8%

Cancelled / Very Late

1.5%

Total Trains

266

PPM: 96%

Worst Performing Operator

c2c

On Time

61.9%

Late

38.1%

Cancelled / Very Late

12.4%

Total Trains

105

PPM: 61%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 29 16 1 45 64% 62%
c2c 65 40 13 105 61% 50%
Caledonian Sleeper Limited 2 0 0 2 100% —
Chiltern 53 22 3 75 70% 65%
CrossCountry 36 10 2 46 78% 75%
East Midlands Railway 83 16 7 99 83% 83%
Elizabeth line 256 10 4 266 96% 98%
Grand Central 0 0 0 0 — —
Great Western Railway 335 41 17 376 89% 90%
Greater Anglia 293 17 3 310 94% 94%
Greater Thameslink Railway 590 239 80 829 71% 66%
Heathrow Express 36 3 0 39 92% 100%
Hull Trains 1 1 0 2 50% 50%
London North Eastern Railway 26 2 0 28 92% 90%
London Overground 331 23 12 354 93% 92%
Lumo East Coast 2 0 0 2 100% 100%
Lumo West Coast 1 0 0 1 100% 100%
Merseyrail 121 7 0 128 94% 98%
Northern Trains 485 113 26 598 81% 82%
ScotRail 341 107 39 448 76% 76%
South Western Railway 273 82 23 355 76% 72%
Southeastern 414 30 3 444 93% 90%
TransPennine Trains 56 7 1 63 88% 90%
Transport for Wales 200 25 12 225 88% 85%
West Midlands Trains 204 51 8 255 80% 77%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 5 0 0 5 100% —
DB Cargo 29 5 0 34 85% 77%
Direct Rail Services 5 1 0 6 83% 75%
Freightliner Intermodal 2 0 0 2 100% —
GB Railfreight 18 2 0 20 90% 100%
Heavy Haul Rail 12 3 0 15 80% 60%
Network Rail - Materials 33 4 0 37 89% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.