Last updated: 08:19:56

On Time

2012

85.6%

Late

339

14.4%

Cancelled / Very Late

105

4.5%

Total

2351

 

National PPM

85%

Rolling: 87%

Counts are for today so far — every train is counted once, on arrival at its final destination.

Best Performing Operator

London North Eastern Railway

On Time

100.0%

Late

0.0%

Cancelled / Very Late

0.0%

Total Trains

10

PPM: 100%

Worst Performing Operator

Avanti West Coast

On Time

50.0%

Late

50.0%

Cancelled / Very Late

10.0%

Total Trains

10

PPM: 50%

Passenger Operators

Operator On Time Late Cxl / V. Late Total PPM Rolling
Avanti West Coast 5 5 1 10 50% 50%
c2c 18 7 1 25 72% 75%
Caledonian Sleeper Limited 2 0 0 2 100% 100%
Chiltern 21 1 0 22 95% 94%
CrossCountry 17 5 4 22 77% 94%
East Midlands Railway 50 4 0 54 92% 91%
Elizabeth line 100 12 0 112 89% 94%
Grand Central 0 0 0 0 — —
Great Western Railway 145 27 13 172 84% 88%
Greater Anglia 139 7 0 146 95% 96%
Greater Thameslink Railway 300 64 22 364 82% 84%
Heathrow Express 24 2 0 26 92% 100%
Hull Trains 0 0 0 0 — —
London North Eastern Railway 10 0 0 10 100% 100%
London Overground 175 33 16 208 84% 80%
Lumo East Coast 0 0 0 0 — —
Lumo West Coast 0 0 0 0 — —
Merseyrail 56 6 1 62 90% 90%
Northern Trains 260 46 17 306 84% 85%
ScotRail 182 16 6 198 91% 92%
South Western Railway 130 42 4 172 75% 71%
Southeastern 146 19 1 165 88% 92%
TransPennine Trains 47 0 0 47 100% 100%
Transport for Wales 123 6 2 129 95% 96%
West Midlands Trains 86 39 17 125 68% 76%

Freight Operators

Freight PPM counts trains arriving within 15 minutes of schedule.

Operator On Time Late Cxl / V. Late Total PPM Rolling
Colas Freight 1 0 0 1 — —
DB Cargo 18 2 0 20 90% 100%
Direct Rail Services 4 0 0 4 100% 100%
Freightliner Intermodal 6 0 0 6 100% 100%
GB Railfreight 7 5 1 12 58% 66%
Heavy Haul Rail 7 0 0 7 100% —
Network Rail - Materials 11 3 0 14 78% 100%

How is performance measured?

The Public Performance Measure (PPM) is Network Rail's own headline figure: the percentage of trains arriving at their final destination within 5 minutes of schedule (10 minutes for long-distance, 15 for freight). "Rolling" is the PPM for the most recent hour. Figures show — until an operator has run trains today, and colours follow Network Rail's red/amber/green thresholds.

Note: Passenger operators must have at least 10 trains in service today to be included in the best/worst ranking; freight operators are not ranked.

Data received from Network Rail every minute. Railway day runs from 02:00 to 01:59 the next day.

Note: Data is approximate and may not be 100% accurate.

Follow the site's progress